
P 5
Please retain product label and instructions for future reference
Step 8
Parts Needed -
No. 12 QTY 2
- No. 13 QTY 1
IMPORTANT:
Pre-drill before fixing screws.
12
13
Pre drill
hole
30mm
screw
Fix the cover trims
(No.12)
to the
gables sides, and the door side cover
trim
(No.13)
to the inner door
framing, securing into place using
3x30mm screws per trim.
9x30mm Screws
12
Attach two t-hinges
(No.17)
to each
door
(No.6)
, securing through to the
door framing with 4x30mm screws
per hinge.
16x30mm Screws
Pre drill
hole
30mm
screw
Step 9
Parts Needed -
No. 6 QTY 2
- No. 17 QTY 4
IMPORTANT:
Pre-drill before fixing screws.
6
6
17
17
17
17
17
Step 10
IMPORTANT:
Pre-drill before fixing screws.
Align each door
(No.6)
into the door
gap and secure at either side using
using 3x30mm screws per t-hinge
(No.17)
.
12x30mm Screws
6
6
Pre drill
hole
30mm
screw
17
7
11
a
b
b
b
Pre drill
hole
30mm
screw
Secure the eaves framing
(No.11)
to
each roof sheet
(No.7)
, flush to the edge,
using 3x30mm screws.
Rest the assembled roof sections on top
of the building and fix into place with
8x30mm screws per roof.
22x30mm Screws
a
Step 11
Parts Needed -
No. 7 QTY 2
- No. 11 QTY 2
IMPORTANT:
Pre-drill before fixing screws.
Содержание 05DTOVPN0365DD-V1
Страница 8: ...P 8 2 1 3 4...
Страница 9: ...P 9 1 2...