Mercia Garden Products 05DTOVPN0365DD-V1 Скачать руководство пользователя страница 4

P 4

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

Please retain product label and instructions for future reference

             

Step 4

Parts Needed -

 

No. 9 QTY 1

                                 

IMPORTANT: 

Pre-drill before fixing screws.

9

Pre drill 

hole

50mm 

screw

Place the first door frame 

(No.9)

 

inbetween the gable and the front panel 

and secure in place using 3x50mm 

screws.

*Ensure to screw through the  framing 

into the floor bearers

**The door opening can be positioned

at either side of the building depending

on your needs and preferences.

3x50mm Screws

10

Pre drill 

hole

50mm 

screw

Attach the door side rail

 (No.10)

 to 

the front panel with 3x50mm 

screws.

*Ensure the door side rail sits on 

top of the bottom framing.

 

**The door opening can be posi-

tioned at either side of the build-

ing depending on your needs and 

preferences.

3x50mm Screws

Step 5

Parts Needed -

 

No. 10 QTY 1

                                 

IMPORTANT: 

Pre-drill before fixing screws.

Step 6

Parts Needed -

 

No. 9 QTY 1

 

 

 - No. 18 QTY 1

                                 

IMPORTANT: 

Pre-drill before fixing screws.

a

b

9

18

Pre drill 

hole

20mm 

screw

30mm 

screw

50mm 

screw

a

b

Using 2x20mm screws fix the “L” 

bracket 

(No.18) 

to one end of the 

remaining door frame.

Place the assembled rail 

(No.9) 

onto the side door rail and secure 

through the top using 1x50mm 

screw and to the gable (

through  

the ”L” bracket

) using 2x30mm 

screws.

2x20mm Screws

2x30mm Screws

1x50mm Screws

Step 7

Parts Needed -

 

No. 8 QTY 1

                                 

IMPORTANT: 

Pre-drill before fixing screws.

Place the roof support bar 

(No.8)

 

centrally in the building and secure 

into place with 2x50mm screws, 

fixing through the top rail and the 

back panel.

2x50mm Screws  

50mm 

screw

8

Pre drill 

hole

Содержание 05DTOVPN0365DD-V1

Страница 1: ...ing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the...

Страница 2: ...45 1178MM 13 Door Side Cover Trim 28x12x1178mm QTY 1 S1228 1178MM 14 15 Back Cover Trim 45x7x1094mm QTY 3 S745 1094MM Floor QTY 2 AI R11OSBF950X920 V1 5 Door QTY 2 AI R11FBOVFLD525X1110 V1 6 Roof QTY...

Страница 3: ...from areas where standing water can collect 3x50mm Screws IMPORTANT Pre drill before fixing screws a Step 2 Parts Needed No 4 QTY 2 No 2 QTY 1 IMPORTANT Pre drill before fixing screws 2 4 4 a Pre dril...

Страница 4: ...ned at either side of the build ing depending on your needs and preferences 3x50mm Screws Step 5 Parts Needed No 10 QTY 1 IMPORTANT Pre drill before fixing screws Step 6 Parts Needed No 9 QTY 1 No 18...

Страница 5: ...Screws Pre drill hole 30mm screw Step 9 Parts Needed No 6 QTY 2 No 17 QTY 4 IMPORTANT Pre drill before fixing screws 6 6 17 17 17 17 17 Step 10 IMPORTANT Pre drill before fixing screws Align each door...

Страница 6: ...19 Pre drill hole 30mm screw 16 Parts Needed No 16 QTY 2 No 19 QTY 2 Line up the door block No 16 at the top and bottom of the secondary door Fix with 2 x30mm screws through the outside of the door in...

Страница 7: ...screw Fix the fascias No 15 around the top of the building make sure to trap the felt inbetween Secure each trim in place with 3x30mm screws 12x30mm Screws Step 16 Parts Needed No 15 QTY 4 IMPORTANT...

Страница 8: ...P 8 2 1 3 4...

Страница 9: ...P 9 1 2...

Отзывы: