P 12
Please retain product label and instructions for future reference
Step 25
To fix the lock to the Shed Door, first fix the Door
Blocks (
No. 34
) either side of the centre framing
of the Door with 4x40mm screws.
Once the Door Blocks are in place the Lock (
No. 36
)
can be fixed in place as shown with 4x30mm
screws, making sure to align the key hole of the
lock to the key hole of the door.
4x30mm Screws
4x40mm Screws
34
36
Pre drill
hole
30mm
screw
40mm
screw
Step 26
Pre drill holes and then fix Chrome Handle
(
No. 37
) using 45mm bolt as shown in diagram.
Fix Door Stop(
No. 33
) to bottom right of door
panel at the back. Use 3x30mm screws.
2x45mm Bolt
3x30mm Screws
Pre drill
hole
37
30mm
screw
30mm
screw
Button
Step 27
Attach two Turn Buttons (
No. 43
) to the Storage
Door at the top and bottom of the door. Using
black screws ensure the screws go through
into the Storage Door Panel framing.
Attach two further Turn Buttons to the Slave
Door at the top and bottom of the door using
black screws.
These Turn Buttons help to keep your doors
straight during high and low levels of
moisture content in the air.
4x30mm Black Screws
Pre drill
hole
43
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefully peel
covering back
Step 28
Содержание 03LBRO1208-V7
Страница 13: ...2 1 3 4...
Страница 14: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...