background image

P 1

03LBRO1208-V7

12x8 Combi Summerhouse

2mm Drill bit

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips 

screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for 

maintenance, annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree 

causing damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can 

be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm 

sunshine and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to 

prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof 

treatment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm 

above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

**Protim Aquatan T5 (621)**

Your building has been dip treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

REGISTER FOR YOUR

ANTI-ROT

GUARANTEE TODAY

PLEASE SCAN HERE:

Содержание 03LBRO1208-V7

Страница 1: ...ossible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect...

Страница 2: ...8 27 26 25 24 23 5x Floor Blocks 28x28x400mm Cover Trim A 12x56x1980mm 2x Cover Trim B 12x56x2000mm Cover Trim C 12x56x2011mm Cover Trim D 12x56x2040mm Cover Trim E 12x56x2070mm 2x Cover Trim F 12x56x...

Страница 3: ...4x50mm screws fix the small floor in place as shown in the diagram 4x50mm Screws Pre drill hole 50mm screw 13 Please retain product label and instructions for future reference 41 42 43 12x Butt Hinge...

Страница 4: ...the side of one Back Panel No 5 against the side of the other Back Panel No 5 with 3x50mm screws as shown in diagram Do not secure the building to the Floor until the roof is fitted 3x50mm Screws Pre...

Страница 5: ...s 21 3 4 Pre drill hole 50mm screw Step 10 Place the Door Panel No 1 onto a flat surface and fix the Front Window Panel No 2 in place as shown Make sure the panels are flush to each other 3x50mm Screw...

Страница 6: ...op and bottom of the door strips as shown in diagram Use 4x10mm screws per barrel bolt Ensure doors open and close freely 10x30mm Screws 8x10mm Screws 40 42 The Mortice Lock is Reversible 39 38 Pre dr...

Страница 7: ...l No 7 with the boarding facing outwards as shown Fix with 3x50mm screws per gable side as shown in diagram Do not secure the building to the Floor until the roof is fitted 6x50mm Screws Pre drill hol...

Страница 8: ...1 Pre drill hole 70mm screw Step 17 Lay the 2x Veranda No 15 face down side by side and fix together with 3x70mm screws through the bearers as shown in the diagram to secure the two Verandas together...

Страница 9: ...ws Pre drill hole 50mm screw Step 19b Fix the two Roof panels together using 50mm screws offset from each other as shown in the diagram Do not secure the building to the Floor until the roof is fitted...

Страница 10: ...through the panel into the floor External panels not shown Pre drill hole 50mm screw 12 Pre drill hole 30mm screw Step 21 Place the Under Roof No 12 into position making sure it is flush to the Door...

Страница 11: ...199x Felt tacks Felt Length 3910mm Ensure you overlap the felt by 100mm Felt tacks 1 2 3 35 P 11 Step 23 Fix the Facias 4x No 29 and 2x No 30 into position as shown No 29 are for the front and No 30 a...

Страница 12: ...No 33 to bottom right of door panel at the back Use 3x30mm screws 2x45mm Bolt 3x30mm Screws Pre drill hole 37 30mm screw 30mm screw Button Step 27 Attach two Turn Buttons No 43 to the Storage Door at...

Страница 13: ...2 1 3 4...

Страница 14: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: