
Please retain product label and instructions for future reference
P 8
Pre drill
hole
40mm
screw
50mm
screw
Repeat Steps 17, 18 & 19 to finish
building the roof support.
4x40mm Screws
16x50mm Screws
Step 20
Parts Needed -
No.15 QTY 4
-
No.16 QTY 2
-
No.19 QTY 4
16
16
19
19
19
19
15
15
15
15
IMPORTANT:
Pre-drill before fixing screws.
Step 21
Parts needed - No 8 QTY 2
- No. 9 QTY 2
60mm
screw
Pre drill
hole
8
8
Place the Roof Panels
(No. 8 & 9)
on top of the
building making sure the framing in the roof
panels sits firmly within the Gables
(No. 6)
and
on top of the Ridge Bar
(No. 13)
.
**Make sure that you have got the roof panels
the correct way round with the recess at the
top of the apex as shown in the diagram.**
From the top, fix directly through the roof panels
(No. 8 & 9)
into the ridge bar
(No. 13)
below
using 60mm screws. Fix a 60mm screw through
the roof panels
(No. 8 & 9)
into the Roof Support
Bars
(No. 15).
It is essential that the ridge bar
(No. 13),
roof
support bars
(No. 15)
and roof panel
(No. 8 & 9)
framing pull together when fixed with 60mm
screws. You may require another person pushing
the ridge bar
(No. 13)
and Roof Support Bars
(No.
15)
up from below to achieve this.
HINT - Follow the nailing line of the framing on
the roof panel so that you are more likely to fix
into the ridge bar below.
22x60mm Screws
IMPORTANT:
Pre-drill before fixing screws.
9
8
9
8
Содержание 03DTSHRA1008FGC42TW-V1
Страница 13: ... 2 1 3 4 ...
Страница 14: ... 1 2 ...