
P 7
Please retain product label and instructions for future reference
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
30mm
screw
Align the ridge bar
(No.12)
between the gables and secure to
the central uprights with 2x30mm
screws per bracket
(No.27)
, as
shown in the illustration.
*Ensure the ridge bar is flush with
the top framing of the gable tops.
4x30mm Screws
Step 16
13
27
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
50mm
screw
15
15
Place the roof support bars
(No.15)
against the ridge bar and the building,
making sure to align the roof support
bars with the upright framing on the
door panel and the back panel.
Secure the bars into the ridge bar with
1x50mm screw per bar, screwing at an
angle as shown in the illustration.
*Ensure to stagger the screws so as not
to hit one screw with another.
2x50mm Screws
Step 17
Parts Needed -
No.15 QTY 2
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
50mm
screw
Fix the roof support blocks
(No.19)
to
the back and door panel upright fram-
ing, ensure there is 15mm between the
roof support bar and the panel framing,
secure with 2x50mm screws per block as
illustrated.
*Ensure the roof support bars meet the
blocks and are level with the gables.
Secure the roof support bar to the block
using 1x50mm screw screwing down
through the bar into the block as shown
in the illustration.
6x50mm Screws
Step 18
Parts Needed -
No.19 QTY 2
19
15mm
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
40mm
screw
16
Secure the roof support brace
(No.16)
between the roof support
bars using 2x40mm screws.
2x40mm Screws
Step 19
Parts Needed -
No.16 QTY 1
Содержание 03DTSHRA1008FGC42TW-V1
Страница 13: ... 2 1 3 4 ...
Страница 14: ... 1 2 ...