
Please retain product label and instructions for future reference
P 12
26
26
30mm
screw
Pre drill
hole
Attach the two turn buttons
(No.26)
to the
secondary door at the top and bottom using
2x30mm screws.
*These turn buttons help to keep your doors
straight during high & low levels of moisture
content in the air.
2x30mm Screws
Step 31
Parts Needed -
No.26 QTY 2
IMPORTANT:
Pre-drill before fixing screws.
26
Pre drill
hole
30mm
screw
20
20
Attach a strip
(No.20)
to the hinged side of
the Master and Secondary doors. Each strip
should overlap onto the plain doors to ensure
the gap is covered.
*These strips allow you to adjust the doors
allowing for moisture absorption and
reduction.
6x30mm Screws
Step 32
Parts Needed -
No.20 QTY 2
IMPORTANT:
Pre-drill before fixing screws.
Please be aware you may need to adjust the doors once the building is fully constructed.
SILICONE
SEALANT
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
Содержание 03DTSHRA1008FGC42TW-V1
Страница 13: ... 2 1 3 4 ...
Страница 14: ... 1 2 ...