
P 6
Please retain product label and instructions for future reference
Pre drill
hole
50mm
screw
Fix the corners of the side
(No.4 and No.3)
and the
front panels with 50mm
screws as shown in the
illustration.
Do
not
secure the building to
the floor until the roof fitted.
6x50mm Screws
3
4
3
Step 12
Parts Needed -
No.4 QTY 1
- No.3 QTY 1
IMPORTANT:
Pre-drill before fixing screws.
Step 13
Parts Needed -
No.6 QTY 2
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
50mm
screw
6
6
Place the gable tops (No.6) onto
the window panels, ensuring the
boards interlock.
Secure in place using 4x50mm
screws per gable top, screwing in
an alternating pattern.
8x50mm Screws
Pre drill
hole
30mm
screw
Step 14
Parts Needed -
No.14 QTY 4
Place the panel framing
(No.14)
along the top of the panel at the
front and back of the building and
secure using 2x50mm screws per
framing piece.
8x50mm Screws
IMPORTANT:
Pre-drill before fixing screws.
14
Pre drill
hole
30mm
screw
31
27
27
13
13
Connect the ridge bars
(No.13)
together
with the metal “U”
(No.31)
channel, using
10x30mm screws.
Attach the “L”
(No.27)
brackets to each
end of the Ridge support with 2x30mm
screws per bracket.
*Ensure the bracket are flush with the
ends of the ridge bar.
14x30mm Screws
Step 15
Parts Needed -
No.13 QTY 2
- No.27 QTY 2
- No.31 QTY 1
IMPORTANT:
Pre-drill before fixing screws.
Содержание 03DTSHRA1008FGC42TW-V1
Страница 13: ... 2 1 3 4 ...
Страница 14: ... 1 2 ...