background image

02DTSHOA08066WBF-V1-PEFC

8x6 Double Storey Playhouse

In all instances for assistance with your product, please contact customer care on :  

01636 821215 or [email protected]

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

Please retain product label and instructions for future reference

        

General Instructions

CAUTION 

Wood is a natural product and can change post manufacture. So despite every effort being 

made to ensure the material used are cut and machined to a clean and smooth finish, care 

must be taken when handling the product and preparing for use by your child.

Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a 

smoother finish. Alternatively, call the customer service department who will be happy to 
arrange replacement panels/parts.

 

WARNING 

 ONLY SUITABLE FOR DOMESTIC USE.

• 

TO BE USED UNDER DIRECT SUPERVISION OF AN ADULT.

 THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY. ANY MODIFICATIONS SHOULD BE 

DETERMINED BY THE MANUFACTURER AND CARRIED OUT ACCORDING TO  THE INSTRUCTIONS.

• 

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY.

 MAX AGE OF 14 YEARS.

• 

THIS TOY IS FOR OUTDOOR USE ONLY.

• 

USE A WATER BASED TREATMENT THAT IS EN71 TESTED 

!

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens products 

independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be erected by 

atleast two adults.

DO NOT ALLOW 

CHILDREN TO ASSIST.

To prevent damage during 

assembly, you 

MUST

 pilot 

drill all screw holes and 

ensure all screw heads are 

countersunk

.

For ease of assembly, you will 

need a tape measure to check 

dimensions of components.

www.merciagardenproducts.co.uk      P1

2mm Drill bit

12mm CSK

**Protim Aquatan T5 (621)**

Your building has been dip treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the 

correct application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels 

and garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium 

dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed in the parts list provided. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

- Ensure you have enough time to build the product to ensure the building is water tight.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to natural processes. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of hot weather 

and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to prevent discolouration 

whilst in stock. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a suitable preservative in accordance with the manufacturers recommendations. 

Care must be taken to ensure the product is placed on a suitable base.

We recommended using a suitable protection for your playhouse. As the product is destined for use by 

children, a water based treatment for childrens toys is ESSENTIAL.

We also recommend treating the building prior to construction.

POSITIONING YOUR PLAYHOUSE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment. 

We recommend a 

minimum space of 2m around a playhouse

, away from any structure or obstructions such as 

fences, garages, houses, overhanging branches, washing lines or electrical wires.

It is recommended that the position of the Playhouse is

 not in direct sunlight.

Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or any hard 

surface.

BUILDING A BASE 

Ensure the base is level and is built on firm ground, to prevent distortion, checking with a spirit level.  Refer to 

diagrams for the base dimensions.  The base should be slightly smaller than the external measurement of the 

building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the 

floor be at least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

- Wooden base.

WARNING: Only for domestic use

Not suitable for children under 36 months due to 

small gaps and danger of falling from heights.

Содержание 02DTSHOA08066WBF-V1-PEFC

Страница 1: ...list provided When you are ready to start make sure you have the right tools at hand not supplied including a Phillips screw driver Flathead screwdriver Stanley knife Wood saw Step ladder Hammer Spiri...

Страница 2: ...product code combinations used to create each playhouse 8x6 Garage 8x6 Playhouse SI 002 001 0082 Model Product Codes 02DTSHOA08066WBF V1 PEFC Playhouse 02DTWP2WPP V1 PEFC Window Pack 8x7 Playhouse Wit...

Страница 3: ...l QTY 1 AI 02SR1309X628 V1 Window QTY 2 AI FW496X462 V1 Double Window QTY 2 AI DFW995X460 V1 Building Components 02DTSHOA08066WBF V1 PEFC Plain Gable Top QTY 1 AI S11SHOAGT2360X802 V1 Window Gable Top...

Страница 4: ...95x1040mm QTY 2 SR1295 G 1040mm 23 Black Handle QTY 2 37 38 PI 07 0033 Hinge QTY 4 PI 07 0113 41 42 Window Box QTY 2 AI 02WB661X92 V1 Window Shutters QTY 2 AI 02WS190X520 V1 43 45 Window Crosses QTY 8...

Страница 5: ...B 27x44x2029mm QTY 1 F2744 G 2049mm angled Support Rail C 27x44x1686mm QTY 1 F2744 G 1706mm angled 53 52 51 02DTSHOA08066WBF V1 PEFC 02DTWP2WPP V1 PEFC 02DTOAVP0801 V1 PEFC 50mm Screw x 8 40mm Screw x...

Страница 6: ...5 14 10 4 14 13 13 10 12mm 12mm 30 2 9 A 30mm screw Step 2 Parts needed 0 Lay the Door Panel No 2 with the boards facing up on a flat surface Place the door No 9 within the door aperture Position two...

Страница 7: ...on the floor as shown in the illustration Fix together by screwing through the framing of the Window Panel No 5 into the framing of the Plain Panel No 3 using 3x50mm screws Do not secure the building...

Страница 8: ...2 Fix by screwing through the Window Panel s framing into the Door Panel No 2 using 6x50mm screws Do not secure the building to the Floor until the Roof is fitted 6x50mm screws 50mm screw 2 2 1 2 Pre...

Страница 9: ...and the Window Gable Top No 10 on top of the Door Panel No 2 ensuring to interlock the bottom board of the gable with the top board of the panel as shown in the diagram Secure the Gables No 10 11 to...

Страница 10: ...n the illustration Fix the Roof bearer No 20 into position with two Corner Brackets No 31 using 4x30mm per bracket as shown Fix into position screws per bracket 8x30mm screws 20 30mm screw 31 1 2 Pre...

Страница 11: ...gable framing and is flush to the back of the building Make sure the 21mm overhang on the roof is at the apex of the building Secure by screwing through the roof panel No 7 into the gable below using...

Страница 12: ...kg 7 8 8 Step 19 Parts needed Once both Roof Panel 2 s No 8 are fixed to the building locate a U channel No 33 around the central framing where the two roofs meet Secure in place using 20mm screws Do...

Страница 13: ...o be cut to fit the angle as shown in the diagram 21x30mm screws 22 23 1 2 Pre drill hole 30mm screw Cut down trims to fit 24 22 22 22 24 23 24 23 23 22 23 If you have purchased a Garage Playhouse ple...

Страница 14: ...35 Step 24a Parts needed Position the second Garage Door No 36 to the left hand side of the door opening Using the Door Spacer Strips No 35 create the 12mm gap between the panel and the door top botto...

Страница 15: ...s per handle 8x30mm black screws 1 2 Pre drill hole 50kg 37 30mm screw 37 37 To finish constructing the playhouse please skip to step 27 on page 18 P15 Please retain product label and instructions for...

Страница 16: ...rts needed Fix the Window Blocks No 46 to the Double Window No 43 as shown with 1x30mm screw Place the Double window No 43 into the newly created window hole between the window panel No 44 and Door Pa...

Страница 17: ...cladding into the Box using 4x20mm screws per box Do not fit the window box underneath the double window if have purchased the playhouse with veranda Locate 2 Window Shutters No 42 around the top wind...

Страница 18: ...m and leave a 50mm overhang on each side Secure with felt tacks at 100mm intervals Please note The cottage playhouse has been usedforillustrativepurposes thisstepisrequired for each playhouse 120x Fel...

Страница 19: ...diately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following checks...

Страница 20: ...wn trims to fit Step 28c Parts needed 40 Locate the Cover Trims No 47 Centrally over where the Window Panel No 44 and Door Panel No 2 join Using a pencil and a straight edge mark the excess onto the s...

Страница 21: ...x40mm screws 2x60mm screws 50 40mm screw 1 2 Pre drill hole 52 50 52 50 60mm screw Step 31c Parts needed Position the Support Rail A No 51 on top of the Veranda Floor No 48 and flush to the Safety Rai...

Страница 22: ...ny points are rounded 50mm screw 41 Felt tacks Step 33c Parts needed Cut the felt No 34 into four strips of 2310mm L X 1000mm W and place on the building in the order shown in the illustration Ensure...

Страница 23: ...ediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following check...

Страница 24: ...2 1 3 4...

Страница 25: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: