background image

Step 2

Parts needed -           &           &           

          

Place the Door Panel 

(No.2)

 and Back Panel 

(No.3)

 on a flat level surface, with the framing 

facing up. 

Locate the Gable Tops 

(No.8)

 on top of the 

Back Panel 

(No.3), 

and Door Panel 

(No.2), 

ensuring to interlock the bottom board of the 

gable with the top board of the panel, as 

shown in the diagram.

Secure the Gable Tops 

(No.8) 

by screwing 

through the framing using 5x50mm screws 

per gable, as shown in the illustration. 

Ensure to stagger screws to avoid collision.

10x50mm screws

1!

2!

Pre drill 

hole

3

2

8

50mm 

screw

Gable Top

Panel

2

8

3

8

 

Step 3

Parts needed -          &          &           

Keep the assembled Door and Back Panels 

(No.2 & 3)

 on a flat level surface. 

Position one Gable Block B 

(No.19)

 onto 

the top of the gable 

(No.8) 

on the shortest 

side, so that the angled end is flush to the 

edge of the Door Panel 

(No.2)

, as shown in 

the illustration. 

Position one Gable Block C 

(No.20)

 onto 

the opposite side of the gable 

(No.8)

 so 

that the angled end is flush to the edge of 

the Door Panel 

(No.2)

, as shown in the 

illustration. 

Position one Gable Block A 

(No.18)

 onto 

the remaining space on top of the gable 

(No.8)

 ensuring there is a 28mm gap 

between Block C 

(No.20)

 and block A 

(No.18)

, as shown in the illustration.

Secure in place by screwing through the 

blocks into the gable framing using 

2x40mm screws per block.

Repeat these steps to fix the remaining 

Gable Blocks to the assembled Back panel 

and gable.

12x40mm screws

1!

2!

Pre drill 

hole

19

2

18

19

20

40mm 

screw

28mm

20

18

19

20

18

20

18

19

Please retain product label and instructions for future reference

             

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P6

Содержание 02DTSHOA0705LFD3WBF-V1-PEFC

Страница 1: ...arts list provided When you are ready to start make sure you have the right tools at hand not supplied including a Phillips screwdriver Flathead screwdriver Stanley knife Wood saw Step ladder Hammer S...

Страница 2: ...e Options Take a look at the different playhouse options below which refers to the product code combinations used to create each playhouse 7x6 Playhouse With Veranda SI 002 001 0107 Model Product Code...

Страница 3: ...AI 02BF1059X1447 V1 Roof 1 QT Y 1 1000 x 1800mm AI S11MBOHAR1000X1800 V1 5 6 7 Roof 2 QTY 1 1410 x 1800mm AI S11MBOHAR1410X1800 V1 8 Safety Rail QTY 1 AI 02SR1020X791 V1 9 10 Door QTY 1 AI 02LFD588X13...

Страница 4: ...AS1295 G 1041mm 29 Gable Block C 28x28x570mm QTY 2 FS2828 590mm angled Gable Cover Trim A 12x28x630mm QTY 2 S1228 630mm Cover Trim A 12x40x1566mm QTY 2 S1240 1566mm Gable Cover Trim B 12x28x907mm QTY...

Страница 5: ...w No 12 into each window hole in the Door Panel No 2 fix by screwing though the Window Blocks No 39 with 2x30mm screws per window block as shown Place one Window No 12 into the window hole in the Wind...

Страница 6: ...t side so that the angled end is flush to the edge of the Door Panel No 2 as shown in the illustration Position one Gable Block C No 20 onto the opposite side of the gable No 8 so that the angled end...

Страница 7: ...ll hole 3 2 41 A B 12mm 12mm 35 2 11 A 35 B 41 41 11 41 41 35 35 35 1 2 Pre drill hole Step 5 Parts needed Place the Floor No 1 on a firm and level base ensure the base has suitable drain age free fro...

Страница 8: ...from the top of the floor to the underside of the Support Bar No 13 Secure in place by screwing through the Support Bar No 13 into the upright panel framing using 4x60mm screws 4x60mm screws 60mm scr...

Страница 9: ...Pre drill hole Bunk floor 60mm screws Framing 1 2 Pre drill hole 50kg 60mm screw 9 Step 13 Parts needed Place the Bunk Floor No 9 on top of the Bunk Floor Support Bar No 13 and horizontal framing of...

Страница 10: ...onto the shorter side of the building ensuring the roof rests into the gaps of the gable framing and is flush to the back of the building Make sure the 10mm overhang on the roof is at the apex of the...

Страница 11: ...the right hand side of the front Gable Top No 8 with 3x30mm screws per trim Fix the Cover Trims A B No 23 24 to the corners of the building with 3x30mm screws per trim TheTrims No 22 23 24 attached to...

Страница 12: ...of and work your way up so that rain pours over the top of the laps and not under them Ensure there is a 50mm overhang around the sides Fix using felt tacks at 100mm intervals 90 Felt Tacks Felt tacks...

Страница 13: ...ayhouse through the cladding into the Box using 4x20mm screws per box Locate 2 Window Shutters No 30 around the windows on the Door Panel Secure in place by screwing from inside the playhouse through...

Страница 14: ...ng has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following checks and maintenance are car...

Страница 15: ...t Rail C No 47 on top of the Veranda Floor No 42 and flush to the Right Side Rail No 44 Fix in place by screwing through the Support Rails No 46 47 into the Side Rails No 44 and through the roof into...

Страница 16: ...screw 1 2 Pre drill hole 43 45 Internal View 43 45 Step 25a Parts needed Cut felt No 40 into 3 sheets measuring 1900mm L X 1000mm W and lay onto roof Start at the bottom of the roof and work your way...

Страница 17: ...p window on the Door Panel Secure in place by screwing from inside the playhouse through the cladding into the Box using 4x20mm screws Locate 2 Window Shutters No 30 around the windows on the Door Pan...

Страница 18: ...seat chains and ropes IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD Step 28a Parts needed Place a Window Frame Cross No 37 against the inside of each window Position the...

Страница 19: ...2 1 3 4...

Страница 20: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: