Step 24a
Parts needed -
Position Support Rail A
(No. 45)
on top of
the Veranda Floor
(No. 42
, and flush to
the Front Rail
(No. 43)
Fix in place by screwing through the
Front Rail
(No. 43)
into the Support Rail A
(No. 45)
and through the roof into the
top of the Support Rail using 3x40mm
screws per rail.
Make sure access to the Door is not
blocked and that the door can open and
close without restrictment.
3x40mm screws.
45
40mm
screw
1!
2!
Pre drill
hole
43
45
Internal View
43
45
Step 25a
Parts needed -
Cut felt
(No. 40)
into 3 sheets
measuring:
1900mm (L) X 1000mm (W)
and lay onto roof. Start at the bottom
of the roof and work your way up so
that rain pours over the top of the laps
and not under them. Ensure there is a
50mm overhang around the sides.
Fix using felt tacks at 100mm intervals.
90 Felt Tacks
Felt
tacks
1!
2!
Pre drill
hole
HANDLE
WITH CARE
1
2
3
4
40
1.
2.
3.
40
www.merciagardenproducts.co.uk P16
Please retain product label and instructions for future reference
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.
Содержание 02DTSHOA0705LFD3WBF-V1-PEFC
Страница 19: ...2 1 3 4...
Страница 20: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...