P 6
Please retain product label and instructions for future reference
Please retain product label and instructions for future reference
Step 10
Secure the building onto the floor using
24x50mm screws. Make sure to align screws
with floor joists.
24x50mm Screws
50mm
screw
Pre drill
hole
Step 11
Slot the Small Bunk Floor
(No. 12)
on top
of the framing of the Plain Panel
(No. 6)
and the Door Panel
(No. 3)
.
Repeat this process with the Large Bunk
Floor
(No. 13)
, ensuring to slot the bunk
floor onto the framing support on the
Veranda Front Panel
(No. 7)
.
Once both bunk floors are in place secure
in place using 22x70mm screws.
22x70mm Screws
70mm
screw
Pre drill
hole
Step 12
Fix the Rail Block
(No. 49)
in line with the
Bunk Floor using 2x50mm screws. Screw
from the outside of the building
Place the Rail End
(No. 18)
into position,
ensure overhang is flush against the Bunk
Floor.
Fix to the Bunk floor and to the side panel
using 6x50mm screws and secure to
through the roof panel with 4x30mm
screws.
4x30mm Screws
8x50mm Screws
Pre drill
hole
30mm
screw
50mm
screw
Step 13
Place the Safety Rail
(No. 19)
up against
the Rail End
(No. 18)
and fix to the Bunk
Floor using 3x50mm screws. Fix the Safety
Rail to the Rail End using 3x60mm screws.
Fix the Rail Support
(No. 45)
to the end of
the Safety Rail using 3x70mm screws.
Attach the Rail Support to the Roof using a
70mm screw to fix through the roof into
the support.
3x50mm Screws
3x60mm Screws
4x70mm Screws
*Ensure all fitted screws do not protrude
from framing and any splinters on
surface are removed. We recommend
finishing framing surfaces with
sandpaper to remove splinters.
70mm
screw
Pre drill
hole
60mm
screw
50mm
screw
12
6
13
7
49
18
45
19