P16

Please retain product label and instructions for future reference

      

29

30

29

Pre drill 

hole

34

29

30

29

34

34

34

32

SILICONE

SEALANT

 

     

Place the plastic window cill 

(No.32) 

onto the Window Panel and 

use a silicone sealant to secure in 

place, as shown in the illustration.

*please note silicone sealant is not 

supplied with your building*

          Fit the styrene sheets 

(No.34) 

on 

top of the window cill 

(No.32)

.

When positioning the styrene sheets 

ensure there is an equal distance 

between them and either side of the 

windows.

Repeat for both Window Panels.

a

b

34

a

b

34

Step 27 (Fixed Window only) 

Parts Needed - No. 32 QTY 2

                                 No. 34 QTY 4 

Styrene

Window Cill

Cladding

Side View

Step 28 (Fixed Window only)

Parts Needed - No. 29 QTY 1

                                 No. 30 QTY 2 

Using a pencil and a straight edge, 

measure the Strips 

(No.29 & 30)

  to 

create

 Six 546mm length strips.

Cut along the marked lines to make 6 

window strips in total, each measuring 

546mm in length. 

Locate the Window strips 

(No. 29 & 30) 

onto the Window Panel, 

one either side of the styrene slot in 

the panel and one in the centre of the 

two pieces of styrene, as shown in the 

illustration.

Fix in place using 3x30mm screws per 

Trim, ensuring the screws enter the 

framing of the window panel and not 

the styrene.

18 x 30mm screws. 

30mm 

screw

IMPORTANT : 

Pre-drill before fixing screws.

*

trim to fit

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Содержание 01OVLPA08DDGP-V1

Страница 1: ...g rain or snow Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required t...

Страница 2: ...SHED FINIAL 18 17 Turn Button QTY 3 PI 07 0034 23 Back Gable Right QTY 1 AI 01OVLPHPGR1155X2089 V1 Front Gable Right QTY 1 AI 01OVLPFGR713X1897 V1 Front Gable Top QTY 1 AI 01OVLPFGT884X439 V1 Door Fra...

Страница 3: ...07 0013 Strip 12x45x1585mm QTY 4 S1245 1585mm 33 34 30 Strip 12x27x1500 QTY 2 S1227 1000mm 31 Eaves Frame 28x28x751mm QTY 8 F2828 751mm 14 7 8 9 26 25 24 27 Building Content 10X8 Pack C No Window No...

Страница 4: ...G 490mm 450mm finished length 29 Strip 12x27x2000 QTY 2 S1227 2500mm Strip 12x45x1585mm QTY 4 S1245 1585mm 30 Strip 12x27x1500 QTY 2 S1227 1000mm 14 7 8 9 Plain Side QTY 4 AI 01OVLPPS1763X1567 V2 Floo...

Страница 5: ...ure to stagger the screws so they do not collide 2 x 50mm screws IMPORTANT Pre drill before fixing screws 2 50mm screw Pre drill hole Step 2 Parts Needed No 2 QTY 1 Lay the Front Gable Left No 2 next...

Страница 6: ...le Step 5 Parts Needed 10x8 No 26 QTY 2 Parts Needed 12x8 No 37 QTY 4 No 40 QTY 8 Place the floors No 26 or 37 on firm and level base ensure the base has suitable drainage free from areas where water...

Страница 7: ...ng into the corner using 50mm screws 3 x 50mm screws 4 5 24 10 x 8 12 x 8 35 4 5 50mm screw Pre drill hole Step 7 Parts Needed 10x8 No 24 QTY 1 No Window QTY 2 No 25 QTY 1 Fixed Window only Parts Need...

Страница 8: ...anel so there is equal spacing between the floor and cladding on each side 3 x 50mm screws 25 10 x 8 12 x 8 36 1 2 3 50mm screw Pre drill hole Step 9 Fix the Door Gable please refer to steps 1 and 2 i...

Страница 9: ...No 22 QTY 2 No 28 QTY 2 No 33 QTY 1 Parts Needed 12x8 No 22 QTY 2 No 33 QTY 1 No 41 QTY 2 Position the two Ridge Bars No 28 or 41 within the U channel No 33 Secure from either side with 3x30mm screws...

Страница 10: ...the first Truss Repeat this method to fit 6 roof truss frames to the shed 6 x 50mm screws IMPORTANT Pre drill before fixing screws 7 7 7 7 7 50mm screw Pre drill hole IMPORTANT Pre drill before fixin...

Страница 11: ...10x8 No 27 QTY 8 Parts Needed 12x8 No 38 QTY 4 Place one Roof Sheet No 27 or 38 on either side of the Shed Position on top of the back gable and truss frame No 7 making sure the roof sheet sits flush...

Страница 12: ...f the Roof sheets on either side of the Shed ensuring they are flush to the end Fix to the roof sheet using 3x30mm screws for each eaves frame 10 x 8 24 x 40mm screws 12 x 8 12 x 40mm screws 30mm scre...

Страница 13: ...felt tacks spaced 100mm apart 190 x Felt Tacks IMPORTANT Pre drill before fixing screws 1 2 3 Felt tacks 14 14 14 14 14 14 40mm screw Pre drill hole Step 20 Parts Needed No 14 QTY 6 Using a pencil and...

Страница 14: ...IMPORTANT Pre drill before fixing screws 13 40mm screw Pre drill hole Step 22 Parts Needed No 15 QTY 1 Using a pencil and a straight edge measure the Strip No 15 to create two 237mm length strips Cut...

Страница 15: ...IMPORTANT Pre drill before fixing screws trim to fit a c b a 30mm screw Pre drill hole Step 24 Parts Needed No 10 QTY 2 No 16 QTY 2 No 23 QTY 2 Place the door blocks No 10 on top of the internal frami...

Страница 16: ...hand door using 30mm screws Locate the remaining turn button No 23 onto the master door and secure using 1x30mm crew 6 x 30mm Screws a a b 11 11 30mm screw Pre drill hole IMPORTANT Pre drill before f...

Страница 17: ...Cladding Side View Step 28 Fixed Window only Parts Needed No 29 QTY 1 No 30 QTY 2 Using a pencil and a straight edge measure the Strips No 29 30 to create Six 546mm length strips Cut along the marked...

Страница 18: ...2 1 3 4...

Страница 19: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: