P 14
Please retain product label and instructions for future reference
12
19
12
40mm
screw
Pre drill
hole
Step 23
Parts Needed - No. 12 QTY 4
No. 19 QTY 2
Using a pencil and a stright edge,
measure the Strip
(No.12)
to
1333mm
.
Cut along the marked line to
make a fascia measuring 1333mm
in length.
Repeat this for all 4 strips
(No.12)
Arrange the Fascias on the front
and back of the shed, ensuring to
trap the felt between the fascia
and the shed.
Secure to the shed using 3x40mm
screws per fascia.
Fix the Diamond Finials
(No.19)
to
the fascias using 2x40mm screws,
ensuring to cover where the
fascias meet.
16 x 40mm Screws
IMPORTANT :
Pre-drill before fixing screws.
*
trim to fit
a
c
b
a
30mm
screw
Pre drill
hole
Step 24
Parts Needed - No. 10 QTY 2
No. 16 QTY 2
No. 23 QTY 2
Place the door blocks
(No.10)
on top of the internal framing on
the top and bottom of the doors
and align the ends to the centre.
Fix with 2x30mm screws per
block by screwing through the
matchboard door into the block.
Locate the strip
(No. 16)
into
the gaps on either side of the
doors, between the door gable
and door.
Fix in place using 4x30mm screws
per strip. Ensure that the screw is
parallel with the door frame when
fixing the strip to the door gable
as shown in the illustration.
Attatch one turn button
(No.23)
to the top and bottom
door blocks with 1x30mm screw
per turn button.
14 x 30mm Screws
b
c
16
16
16
10
23
10
10
23
23
IMPORTANT :
Pre-drill before fixing screws.
Содержание 01OVLPA08DDGP-V1
Страница 18: ...2 1 3 4...
Страница 19: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...