background image

REGISTER FOR YOUR

ANTI-ROT

GUARANTEE TODAY

PLEASE SCAN HERE:

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

01MODP0804-V2

8X4 MODULAR PENT

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or 

extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treatment 

to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  

The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap 

the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding 

ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

Refer to the instructions pages for your specific product code

**Protim Aquatan T5 (621)**

Your building has been dip treated with Aquatan.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

P 1

Please retain product label and instructions for future reference

             

General Instructions

Содержание 01MODP0804-V2

Страница 1: ...door building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treat...

Страница 2: ...P0804PT V2 Window Panel QTY 2 AI 01MODP0804WS V2 Door Panel QTY 1 AI 01MODP0804DG V2 Gable Top Right QTY 1 AI 01MODP0804GTR V2 Roof Panel QTY 2 AI 01MODP0804R V2 Floor Panel QTY 1 AI 01MODP0804F V2 Bu...

Страница 3: ...rews Pre drill hole 30mm screw Step 2 Parts needed No 4 QTY 1 Place the floor No 4 on a firm and level base ensure base has suitable drainage free from areas where standing water can collect See front...

Страница 4: ...ion the panels so there is equal spacing between the floor and cladding on all four sides 16x50mm screws 6 7 50mm screw Pre drill hole Step 6 Parts needed No 6 QTY 1 No 7 QTY 1 Place the left No 6 and...

Страница 5: ...g 50mm screws 10x50mm Screws Felt tacks 14 Step 9 Parts needed No 14 QTY 1 Cut felt No 14 into two sheets ensuring they are both long enough to cover roof with 50mm overhang around the sides Overlap w...

Страница 6: ...2 QTY 2 No 13 QTY 4 Fix fascias No 12 13 using 40mm screws Pre drill holes to avoid splitting Ensure to the trap the felt between the fascia and building 24x40mm Screws Pre drill hole Door Step 13 Par...

Страница 7: ...to assemble shed unit Ensure the large centre cover trim has not been fitted see step 11 Follow instructions for 04LEAN0804 V1 to assemble pent greenhouse unit up against the tall side of the Pent she...

Страница 8: ...and instructions for future reference P 8 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Страница 9: ...P 9 2 1 3 4...

Страница 10: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: