background image

P 6

Please retain product label and instructions for future reference

             

IMPORTANT

Do no fit centre strip if 

attaching 04LEAN0804 unit 

(see 04GRECOM0808 

assembly)

10

10

10

30mm 

screw

Step 11

Parts needed - No. 10 QTY 3

  

Fix large cover trims (No. 10) to 

the other side of building using 3 

x 30mm screws per trim.

9x30mm Screws

Pre drill 

hole

40mm 

screw

12

13

12

13

13

Step 12

Parts needed - No. 12 QTY 2

                                 No. 13 QTY 4

  

Fix fascias (No. 12 & 13)  using 40mm 

screws. Pre drill holes to avoid 

splitting. Ensure to the trap the felt 

between the fascia and building.

24x40mm Screws

Pre drill 

hole

Door

Step 13

Parts needed - No. 15 QTY 1

                                 No. 17 QTY 2

  

Attach the turn buttons (No.17) to 

the top and bottom of the door using

1x30mm screws per turn button as 

shown in the illustration.

It is important to fit turn buttons in 

order to minimise door warping.

Fix Pad bolt (No. 15) using 10x30mm 

screws. Ensure padbolt and screws 

are in line with centre door brace.

12x30mm Screws

30mm 

screw

Pre drill 

hole

17

15

Содержание 01MODP0804-V2

Страница 1: ...door building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treat...

Страница 2: ...P0804PT V2 Window Panel QTY 2 AI 01MODP0804WS V2 Door Panel QTY 1 AI 01MODP0804DG V2 Gable Top Right QTY 1 AI 01MODP0804GTR V2 Roof Panel QTY 2 AI 01MODP0804R V2 Floor Panel QTY 1 AI 01MODP0804F V2 Bu...

Страница 3: ...rews Pre drill hole 30mm screw Step 2 Parts needed No 4 QTY 1 Place the floor No 4 on a firm and level base ensure base has suitable drainage free from areas where standing water can collect See front...

Страница 4: ...ion the panels so there is equal spacing between the floor and cladding on all four sides 16x50mm screws 6 7 50mm screw Pre drill hole Step 6 Parts needed No 6 QTY 1 No 7 QTY 1 Place the left No 6 and...

Страница 5: ...g 50mm screws 10x50mm Screws Felt tacks 14 Step 9 Parts needed No 14 QTY 1 Cut felt No 14 into two sheets ensuring they are both long enough to cover roof with 50mm overhang around the sides Overlap w...

Страница 6: ...2 QTY 2 No 13 QTY 4 Fix fascias No 12 13 using 40mm screws Pre drill holes to avoid splitting Ensure to the trap the felt between the fascia and building 24x40mm Screws Pre drill hole Door Step 13 Par...

Страница 7: ...to assemble shed unit Ensure the large centre cover trim has not been fitted see step 11 Follow instructions for 04LEAN0804 V1 to assemble pent greenhouse unit up against the tall side of the Pent she...

Страница 8: ...and instructions for future reference P 8 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Страница 9: ...P 9 2 1 3 4...

Страница 10: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: