background image

17

18

19

20

21

22

50mm Screw x 46 

20mm Screw x 8

40mm Screw x 34

30mm Screw x 88

60mm Screw x 10

Felt Tacks x 66

23

24

P 2

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

01DTSHOSBRAX0604SDFW-V1

Overall Dimensions:

Width = 1318mm 

Depth = 1842mm 

Height = 2087mm

Base Dimensions: 

Width = 1175mm 

Depth = 1753mm 

Please retain product label and instructions for future reference

             

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

Nail Bag

There may be extra screws present in the nail bag 

The building that you have purchased can be built 

as an Apex or a Reverse Apex.  Also you can choose 

in which arrangement you wish to have your panels 

set up.  See these images on display to give you an 

idea of  which set up is most suitable for you.

2

1

3

4

5

6

7

Door Panel QTY 1

AI-01S11SHSD1180X1802-V1

Plain Panel 1 QTY 2

AI-S11SHPPTF524X1802-V1

Plain Panel 2 QTY 2

AI-S11SHPPTF1180X1802-V1

Door QTY 1

AI-S11FBMBZBD743X1680-V1

Roof QTY 2

AI-S11OSBOHAR715X1794-V1

Floor QTY 1

AI-R11OSBF1175X1753-V1

Gable Top QTY 2

AI-S11SHAGT1180X262-V1

9

Door Beading Strip 12x28x1590mm QTY 2

S1228-1590mm

10

Cover Trims 12x40x1792mm QTY6

S1240-1792mm

11

Fascias 12x60x690mm QTY 4

S1260-690mm

12

Door Block 28x28x150mm QTY 1

FS2828-150mm

13

Ridge Bar 28x28x1704mm QTY 1

FS2828-1704mm

14

Window Strip 12x28x550mm QTY 4

S1228-550mm

15

Window Cover trims 12x40x513mm QTY 3

S1240-513mm

16

Window Cover trims 12x40x1180mm QTY 1

S1240-1180mm

Shed diamond 

Finial QTY 2

Shed diamond Finial

Corner Brace QTY 2

PI-07-0012

T-Hinge QTY 3

PI-07-0021

Turn Button QTY 2

PI-07-0034

Felt QTY 1

PI-01-0013

Pad Bolt QTY 1

PI-07-0035

Window Panel QTY 1

AI-01S11SH2CW1180X1802-V1

8

Styrene QTY 2

PI-05-0114

Cilled Window QTY 1

PI-08-0013

Содержание 01DTSHOSBRAX0604SDFW-V1

Страница 1: ...n building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration of h...

Страница 2: ...Door Panel QTY 1 AI 01S11SHSD1180X1802 V1 Plain Panel 1 QTY 2 AI S11SHPPTF524X1802 V1 Plain Panel 2 QTY 2 AI S11SHPPTF1180X1802 V1 Door QTY 1 AI S11FBMBZBD743X1680 V1 Roof QTY 2 AI S11OSBOHAR715X1794...

Страница 3: ...an collect See front page for base requirements 6 Step 2 Parts needed No 1 QTY 1 No 4 QTY 1 No 19 QTY 3 Place the door No 4 within the Door Panel No 1 Fix the T Hinges No 19 onto the door and Door Pan...

Страница 4: ...n Panel 2 No 3 or panel of your choice to the already standing chosen panel with 50mm screws as shown in diagram Do not secure the building to the floor until the roof has been fitted Position the pan...

Страница 5: ...TY 2 Place the Roof Panels No 5 on top of the building making sure the framing in the roof panels sits firmly within the Gable Tops No 7 and on top of the Ridge Bar No 13 Make sure that you have got t...

Страница 6: ...e is an equal distance on all sides Attach 1x Outer Window Strip No 16 along the top of the window opening Followed by attaching 3x Outer Window Strips No 15 to either side of the windows and the cent...

Страница 7: ...p 14 Parts needed No 10 QTY 6 Fit the Cover Trims No 10 over each panel join and corner of the building as shown in the illustration using 30mm screws Pre drill to avoid splitting 18x30mm Screws 30mm...

Страница 8: ...ks using 30mm screws 2x30mm Screws Step 16 Parts needed No 9 QTY 2 No 12 QTY 1 30mm screw 30mm screw Pre drill hole Pre drill hole a b 9 9 12 b a b Step 17 Parts needed No 20 QTY 1 Screw the Pad Bolt...

Страница 9: ...and instructions for future reference P 9 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Страница 10: ...2 1 3 4...

Страница 11: ...1 2...

Отзывы: