background image

× 

75

× 

10

× 

12

× 

540

× 

30

× 

30

4

×

40

5

×

70

4

×

50

6

×

140

1,4

×

40

M8

×

70

Ø 3 

mm

Ø 4 mm

Ø 5 mm

Ø 8 mm

1/20

BRANTEVIK II 40

PREPARE THE 

GROUND

, UNWRAP THE 

PACKAGE, 

LAY OUT THE 

COMPONENTS

, FIND THE 

TOOLS.

Summary of Contents for Brantevik II 40

Page 1: ...75 10 12 540 30 30 4 40 5 70 4 50 6 140 1 4 40 M8 70 3 mm 4 mm 5 mm 8 mm 1 20 BRANTEVIK II 40 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Page 2: ...40 MAKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB...

Page 3: ...0 BRANTEVIK II 40 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 5 2 BL 1 6 140 1 BL 1...

Page 4: ...4 5 70 4 mm 4 6 140 5 mm 4 20 BRANTEVIK II 40 7 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 2 LG 6 1 LG 2 1 LG 6 6 140 5 70...

Page 5: ...5 20 BRANTEVIK II 40 12 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Page 6: ...6 20 BRANTEVIK II 40 13 SLIDE THE DOOR IN ATTACH THE HANDLE CDD1R 3 LOGS IN PLACE...

Page 7: ...1 LG 2 1 LG 2 1 LG 1 7 20 BRANTEVIK II 40 26 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS...

Page 8: ...8 20 BRANTEVIK II 40 SLIDE THE WINDOW IN ATTACH THE HANDLE 28 CW1R...

Page 9: ...4 6 140 5 mm 9 20 BRANTEVIK II 40 42 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 14 LOGS IN PLACE GABLE B TL 1 A TL 1 B LG 4 B LG 3 B LG 2 A LG 2 A LG 3 A LG 4...

Page 10: ...6 6 140 5 mm 10 20 BRANTEVIK II 40 43 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS RFR RFB RFB...

Page 11: ...288 4 50 11 20 BRANTEVIK II 40 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 6 SCREWS 3 INTO EACH NEXT SAWTHE LAST BOARDTO MAKE IT FIT 46 RB...

Page 12: ...44 4 40 12 20 BRANTEVIK II 40 79 FOR THE FASCIA TRIMS INSERT SCREWS AFTER EVERY 0 5 METERS RR1 RR2...

Page 13: ...32 4 40 3 mm 13 20 BRANTEVIK II 40 83 EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED RF EE...

Page 14: ...4 4 40 3 mm 14 20 BRANTEVIK II 40 84 ATTACH ROMBS WITH SCREWS ROMB...

Page 15: ...238 4 50 15 20 BRANTEVIK II 40 89 14 SCREWS INTO THE FIRST FLOORBOARD 7 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB...

Page 16: ...30 1 4 40 16 20 BRANTEVIK II 40 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Page 17: ...E MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLTS 97 WINDBOARD CONNECTS BOTTOM LOG WITH THE TOP LOG SAW THE WINDBOARD INTO THE RIGHT LENGTH FOR THE TOP BOLT DRILL 8MM HOLE THROUGH THE WINDBOARD 17...

Page 18: ...90 90 18 20 BRANTEVIK II 40 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90...

Page 19: ...19 20 BRANTEVIK II 40 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Page 20: ...20 20 BRANTEVIK II 40 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Reviews: