P 5
Please retain product label and instructions for future reference
Step 7
Parts needed - No. 7 QTY 2
Place the Gable Tops
(No. 7)
central over the
end panels. Make sure that the cladding
slots together and fix into position using
50mm screws.
Fix together using 8x50mm screws
staggering the screws so they don’t collide.
8x50mm Screws
50mm
screw
Pre drill
hole
7
7
Step 8
Parts needed - No. 13 QTY 1
No. 18 QTY 2
Place the ridge bar
(No. 13)
in between the
Gable Tops
(No. 7)
in line with the central
framing of the gable tops.
Fix the ridge bar to the gable using one
L bracket
(No. 18)
for each end. Fix with
4x20mm screws each.
8x20mm Screws
20mm
screw
Pre drill
hole
13
18
Step 9
Parts needed - No. 5 QTY 2
Place the Roof Panels
(No. 5)
on top of the
building making sure the framing in the roof
panels sits firmly within the Gable Tops
(No. 7)
and on top of the Ridge Bar
(No. 13)
.
**Make sure that you have got the roof panels
the correct way round with the recess at the top
of the apex as shown in the diagram.**
**The edges of the roof panels must be flush
with the outer cladding of the Gable Tops
(No. 7).**
From the top, fix directly through the roof panels
(No. 5)
and into the ridge bar
(No. 13)
below
using 5x60mm screws per roof panel .
It is essential that the ridge bar
(No. 13)
and roof
panel
(No. 5)
framing pull together when fixed
with 60mm screws. You may require another person
pushing the ridge bar
(No. 13)
up from below to
achieve this.
HINT - Follow the nailing line of the framing on
the roof panel so that you are more likely to
fix into the ridge bar below.
10x60mm Screws
60mm
screw
Pre drill
hole
5
5