background image

P 7

             

Please retain product label and instructions for future reference

             

22

22

HANDLE

WITH CARE

1

2

3

4

Felt 

tacks 

Step 13

Parts needed - No. 22 QTY 1

                                 

Cut the felt 

(No. 22)

 into two sheets at 

1900mm.  Lay onto roof as shown in 

diagram ensuring there is a 50mm 

overhang around the sides.

Apply the felt tacks with a 100mm space 

per tack.

66x Tacks

22

10

Step 14

Parts needed - No. 10 QTY 6

Fit the Cover Trims 

(No. 10)

 over each 

panel join and corner of the building 

as shown in the illustration using 

30mm screws.  Pre drill to avoid 

splitting. 

18x30mm Screws

30mm 

screw

Pre drill 

hole

10

10

10

Step 15

Parts needed - No. 11 QTY 4

                                 No. 17 QTY 2

Fit the Fascias 

(No. 11)

 to the roof over 

the felt and secure in place with 40mm 

screws as shown.  Pre drill to avoid 

splitting.

Followed by adding the Finials 

(No. 17)

 

over the Fascias using x2 40mm screws 

per Finial.    

 

16x40mm Screws

40mm 

screw

Pre drill 

hole

11

11

17

17

11

11

Содержание 01DTSHOSBRAX0604SDFW-V1

Страница 1: ...n building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration of h...

Страница 2: ...Door Panel QTY 1 AI 01S11SHSD1180X1802 V1 Plain Panel 1 QTY 2 AI S11SHPPTF524X1802 V1 Plain Panel 2 QTY 2 AI S11SHPPTF1180X1802 V1 Door QTY 1 AI S11FBMBZBD743X1680 V1 Roof QTY 2 AI S11OSBOHAR715X1794...

Страница 3: ...an collect See front page for base requirements 6 Step 2 Parts needed No 1 QTY 1 No 4 QTY 1 No 19 QTY 3 Place the door No 4 within the Door Panel No 1 Fix the T Hinges No 19 onto the door and Door Pan...

Страница 4: ...n Panel 2 No 3 or panel of your choice to the already standing chosen panel with 50mm screws as shown in diagram Do not secure the building to the floor until the roof has been fitted Position the pan...

Страница 5: ...TY 2 Place the Roof Panels No 5 on top of the building making sure the framing in the roof panels sits firmly within the Gable Tops No 7 and on top of the Ridge Bar No 13 Make sure that you have got t...

Страница 6: ...e is an equal distance on all sides Attach 1x Outer Window Strip No 16 along the top of the window opening Followed by attaching 3x Outer Window Strips No 15 to either side of the windows and the cent...

Страница 7: ...p 14 Parts needed No 10 QTY 6 Fit the Cover Trims No 10 over each panel join and corner of the building as shown in the illustration using 30mm screws Pre drill to avoid splitting 18x30mm Screws 30mm...

Страница 8: ...ks using 30mm screws 2x30mm Screws Step 16 Parts needed No 9 QTY 2 No 12 QTY 1 30mm screw 30mm screw Pre drill hole Pre drill hole a b 9 9 12 b a b Step 17 Parts needed No 20 QTY 1 Screw the Pad Bolt...

Страница 9: ...and instructions for future reference P 9 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Страница 10: ...2 1 3 4...

Страница 11: ...1 2...

Отзывы: