P 4
Please retain product label and instructions for future reference
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
3
Step 5
Following the same method outlined
in step 4, place the next 2 panels onto
the floor and secure in place using
6x50mm screws.
6x50mm Screws
Pre drill
hole
50mm
screw
a
a
a
1
a
a
a
Step 6
Continue to follow the method
outlined in step 4. Place the
remaining gable and window
panel onto the floor and fix using
9x50mm screws.
9x50mm Screws
Pre drill
hole
50mm
screw
a
a
a
a
a
a
a
a
5
2
Step 7
Place a roof support bar
(No. 12)
inbetween the framing on the door
panel
(No. 1)
and plain panel
(No. 3)
,
aligning with the top of the gable.
Mark the position with a pencil.
Fix the roof blocks
(No. 11)
to the door
and plain panels in line with the pencil
mark and secure using 2x50mm
screws per block.
Place the roof support
(No. 12)
on top
of the blocks
(No. 11)
and fix in place with
2x70mm screws per side.
*Repeat this process with the
remaining roof supports and
blocks.
12x50mm Screws
6x70mm Screws
Pre drill
hole
50mm
screw
11
12
70mm
screw
*If you have purchased the T&G floor and
roof option please continue to
step 8
8
13
13
Step 8
Attach the 2x eaves frames
(No. 13)
to
each roof sheet
(No. 8)
using 3x30mm
screws per eaves frame.
*Ensure the eaves are flush to the
edges of the roof sheet.
*
For T&G roof options use the same
method as stated above ensuring the
eaves framing is flush with the edge
of the roof framing and screwed
directly through the eaves framing
into the roof framing and not into
the T&G boards.
12x40mm Screws
Pre drill
hole
30mm
screw
13
13
8
*OSB OPTION
*T&G OPTION