background image

P 5

Please retain product label and instructions for future reference

             

Step 9

Place the assembled roof panels

on to the building and secure as

shown in the illustration with

18x30mm screws

* Ensure the roofs are flush with

the sides of the building. Ensure

the eaves frame sits over the

window and door panels.

18x30mm Screws

Pre drill 

hole

30mm 

screw

*If you have purchased the T&G roof and floor option ensure to fix 

the roof to the building using 18x70mm screws following the 

same method outlined above.

Internally

:  Secure the roof panels together where they join using 

5x50mm screws.

18x70mm Screws

5x50mm Screws

Pre drill 

hole

70mm 

screw

50mm 

screw

Step 10    

 

Secure the building to the

 

floor using 18x50mm screws.

*Ensure to screw through the framing

into the floor bearers.

18x50mm Screws

Pre drill 

hole

50mm 

screw

b

b

b

b

b

b

b

b b

b

b

HANDLE

WITH CARE

1

2

3

4

Step 11

Cut the felt into 2 sheets and lay

onto the roof.

* Ensure there is approximately 

50mm of overhang around the

building.

Fix into place using 175x felt tacks

at 100mm intervals.

175xFelt Tacks

Felt 

tacks 

Felt size: 10x6 - 3200mm

 

    12x6 - 3740mm

 

    14x6 - 4370mm

Step 12

Measure the side of the roof,

cut 2x 

(No.19) 

fascias to size and fix in

place using 3x30mm screws.

Measure the distance between

the 2 facias at the front of the 

building & cut 2x

 (No. 19)

 facias to match 

the gap. Secure to the building

using 6x30mm screws. 

12x30mm Screws

Cut down to fit

Pre drill 

hole

30mm 

screw

19

19

19

19

Отзывы: