Страница 1: ...Mercedes Benz Energy Storage Home Manual...

Страница 2: ......

Страница 3: ...storage modules 14 4 1 2 Wall assembly 14 4 1 2 1 Installing installation rail wall 14 4 1 2 2 Install energy storage modules 14 4 1 2 3 Installing base cover 15 4 2 Connecting up a unit 15 4 2 1 Pro...

Страница 4: ...all where the energy storage module is installed must be non flammable cement or stone Do not install in areas subject to fire or explosion hazard For wall assembly the wall should be able to bear at...

Страница 5: ...d with Never lean over the banister Information Information which is important but not safety related Wash your hands before eating 1 2 3 Operating instructions with a fixed sequence and outcome 1 Pre...

Страница 6: ...ge module may cause internal or external short circuits These lead to high compensating currents which may result in fire In liquid or steam form the electrolyte used is highly flammable Never force o...

Страница 7: ...or damage objects even if falling from a low height Wear suitable protective equipment when transporting or assembling energy storage modules 2 2 Personal protective equipment PPE S 8 Use the handles...

Страница 8: ...Chemical protection clothing CAUTION Water damage hazard If moisture for instance in the form of splashes steam condensation etc penetrates the housing there is a risk of severe impairment to the syst...

Страница 9: ...rts please contact your reseller or installer System cover 1 1x System cover 2 2x Expanding rivets 3 1x RJ45 terminating resistor 4 1x RJ45 ribbon cable 5 1x Warning sticker 6 2x HV cable 25 mm for in...

Страница 10: ...ystem only use approved inverters Base upright installation 1 1x Base 2 2x Trunking covers for bases 3 2x Screws for trunking cover 4 1x Protective earths 5 2x Screws for trunking covers 1 2 3 4 5 Flo...

Страница 11: ...mm 870 mm 200 mm 200 mm 300 mm 390 mm 362 mm 790 mm 500 mm 300 mm 870 mm 200 mm 200 mm 300 mm 390 mm 362 mm 370 mm Freestanding Wall mounted 3 4 Connections CON2 CON3 11 Mercedes Benz Energy Storage...

Страница 12: ...ects even if falling from a low height Wear suitable protective equipment when transporting or assembling energy storage modules 2 2 Personal protective equipment PPE S 8 Use the handles provided when...

Страница 13: ...nstalling five or more energy storage modules a second unit will have to be assembled Only use the original parts supplied for installation To ensure stable installation check that the base is horizon...

Страница 14: ...imum spacing of 50 cm to the base bottom of the installation rail wall Installation rail wall installed Make sure that the rails are firmly attached to the wall The wall should be able to bear the tot...

Страница 15: ...tommost energy storage module vertically from the bottom 2 Attach the base cover to the left and right of the energy storage module using expanding rivets Base cover installed 4 2 1 Protective earth I...

Страница 16: ...now connected The positive terminal of the feed through terminal block is marked with 4 2 3 Negative terminal 1 Insert the negative terminal of the HV cable black into the negative terminal of the fee...

Страница 17: ...tive terminal on the feed through terminal block is marked with Note that the cables to the inverter must be at tached to the wall in order to relieve the strain on it 4 2 4 Communication link 1 Inser...

Страница 18: ...train on it 1 Connect the individual units as described in the section Connecting the module to the inverter 4 3 Connecting the module to the inverter S 17 2 Next connect the HV cable 25mm in parallel...

Страница 19: ...on with the inverter into the RJ45 connection socket on top of the system cover Communication link with the inverter now connected 1 2 3 4 4 1 Insert the groove on the trunking cover base into the ton...

Страница 20: ...ermines how it is started up for the first time For this reason refer to Recommended procedure for setting up the system which is enclosed for further information Make sure you have the correct docume...

Страница 21: ...resistor 7 Unplug all HV cables from the positive and negative terminals and remove them 8 Unplug all protective earth and remove them 9 Remove the nuts from the installation rails 10 Remove the energ...

Страница 22: ...h a factory preset charge state The longer the system is kept in storage the more the charge state decreases potentially reaching a critical range For this reason you should never store the energy sto...

Страница 23: ...mum wall installation height 430mm 1180mm Maximum and minimum upright installation total weight Approx 37 kg and approx 133 kg Maximum and minimum wall installation total weight Approx 35 kg and appro...

Страница 24: ...m 4 11V Charge temperature Minimum 6 C Maximum 44 C Discharge temperature Minimum 6 C Maximum 44 C 12 3 Emergency shutdown safety limits Condition state Recommendation Cell voltage Minimum 3 V Maximum...

Страница 25: ...asy access Your Mercedes Benz Energy Storage Home Number Date Serial number Hardware status Software status Storage duration 1 2 3 4 5 6 7 8 Periphery used Inverter Energy management system Size of PV...

Страница 26: ...Your notes 26...

Страница 27: ......

Страница 28: ...ten consent of Deutsche ACCUMOTIVE GmbH Co KG Mercedes Benz SMA and Deutsche ACCUMOTIVE are registered trade names of the respective companies Any product or company names mentioned in this manual may...

Отзывы: