Renewal of timing chain
Preceding work:
Cylinder head cover removed.
nozzles removed (07.1-230).
Fan and fan shroud removed (20-312 or
Operation No. of Operatron Texts and Work
Standard Texts and Flat Rates
244
215
PO5
0182 37
Chain tensioner (244)
. . . . . . . . . . . . . . . . . . . .
Remove and install (05-310).
Camshaft timing gear (188)
. . , . . . . . . . , . . . . ,
check for scores and pitting (Number 2).
chain
separate, mount new
connecting
to the old
turn
engine and raise old
and detach
(Numbers 3
Caution!
The
must
engagement on
the camshaft and crankshaft gear as the
is turned.
0510-3201
Содержание 602
Страница 1: ...Mercedes Benz Mercedes Benz of North America Inc Montvale NJ 07645 ...
Страница 5: ...General technical data 00 ...
Страница 15: ...Crankcase and Cylinder Head 01 ...
Страница 22: ......
Страница 33: ......
Страница 89: ......
Страница 140: ......
Страница 166: ... Special tool Note When testing and reconditioning crankshafts proceed in sequence shown in diagram below 03 10 31813 ...
Страница 191: ...This page int ntiowally left blank 03 10 32113 ...
Страница 217: ...Flywheels for manual transmissions Engine 602 D 252 94 252 98 mm Dl 223 00 223 07 mm H 57 mm 03 10 41013 ...
Страница 227: ...ine Timing Valvstr ...
Страница 282: ...Special tool f 05 10 310 5 ...
Страница 301: ...ystern Air r Turbocharger 09 ...