DISASSEMBLY INSTRUCTIONS
B2-2
2-6: TENSION ASS'Y (Refer to Fig. 2-6-B)
Turn the Pinch Roller Cam clockwise so that the
Tension Holder hook is set to the position of Fig. 2-6-A
to move the Tension Arm Ass'y.
Remove the Tension Spring.
Unlock the 2 supports (1) and remove the Tension
Band.
Unlock the support (2) and remove the Tension Arm
Ass'y.
Unlock the support (3) and remove the Tension
Connect.
Float the hook (4) and turn it clockwise then remove
the Tension Holder.
1.
2.
3.
4.
5.
6.
Fig. 2-6-A
Tension Arm Ass'y
Fig. 2-6-B
Fig. 2-6-D
Tension Band
Tension Spring
(1)
(2)
(4)
Tension Band
Tension Arm Ass'y
(3)
(1)
Tension Holder
Tension Connect
NOTE
1.
2.
3.
In case of the Tension Band installation, note the
direction of the installation. (Refer to Fig. 2-6-C)
In case of the Tension Band installation, install correctly
as Fig. 2-6-D.
In case of the Tension Connect installation, install as
the circled section of Fig. 2-6-E.
Tension Band
Tension Connect
Tension Connect
[OK]
[NG]
Fig. 2-6-E
Tension Connect
Main Chassis
Fig. 2-6-C
Tension Band
Tension Connect
Loading Motor
Capstan DD Unit
-
+
L2
L1
Pink
Fig. 2-5-D
White
2-7: T BRAKE ARM/T BRAKE BAND (Refer to Fig. 2-7-A)
Remove the T Brake Spring.
Turn the T Brake Arm clockwise and bend the hook
section to remove it.
Unlock the 2 supports (1) and remove the T Brake
Band.
1.
2.
3.
T Brake Band
Hook section
T Brake Spring
T Brake Arm
(1)
(1)
Fig. 2-7-A
Fig. 2-5-C
Loading Motor
Slacken the wire.
Содержание MVDT2002
Страница 90: ...M5T4 09Q SPEC NO O R NO W575047...
Страница 106: ...M5T4 10J SPEC NO O R NO W585048...
Страница 200: ...M5V4 04J SPEC NO O R NO W625039...