Installation
67
Mellanox Technologies
Figure 52: Intact Spine Signal Connectors
Step 3.
Check power connector’s integrity. Look for any damage on the power connector casing or
blades damage, or any deviations from the pass criterion shown in
Figure 53: Intact Spine Power Pin Holders
Step 4.
Start with the ejector handles fully open; that is, at 45 degrees to the front panel of the spine.
Step 5.
Holding the spine by its sides, carefully set the spine module halfway into the chassis.
Step 6.
Using only the ejector handles, slowly slide the module into the chassis until the hooks
reach the vertical bar.
Step 7.
Catch the ejector handle hooks onto the vertical bar of the chassis and push the ejector han-
dles shut (
).
Do not use the fan FRU handle to insert the spine module.
Do not apply excessive force to slide in the spine module. If you feel resistance,
remove the spine and double check both the chassis and spine for any damage.
Содержание Switch-IB
Страница 2: ...Doc MLNX 15 4748 324 2 Mellanox Technologies...
Страница 103: ...104 Mellanox Technologies Figure 77 InfiniBand QSFP Connector Symbol...
Страница 104: ...105 Mellanox Technologies Figure 78 QSFP Connector Male and Female Views...
Страница 111: ...112 Mellanox Technologies 6 7 8 9 10 11...
Страница 112: ...113 Mellanox Technologies 12 13 14 15 16 17...
Страница 113: ...114 Mellanox Technologies 18 19 20 21 WEEE 22 H 4 Chinese 1...
Страница 114: ...115 Mellanox Technologies 2 3 4 5 6 7 8 r r 368...
Страница 115: ...116 Mellanox Technologies 9 10 InfiniBand 11 12 13 14 15 UL CSA 16 QILQL DQG 8 6 9 5 9 39 9...
Страница 116: ...117 Mellanox Technologies 17 18 19 20 WEEE 21 56 8 3 3 36 71 7...
Страница 127: ...128 Mellanox Technologies 3 4 5 6 7 8 9 45 C 113 F 8 3...
Страница 144: ...145 Mellanox Technologies 5 6 7 8 9 10 11 FP 368...
Страница 146: ...147 Mellanox Technologies 19 20 21 2 2 71 7...