![Meler Macro Series Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/meler/macro-series/macro-series_instruction-manual_1767094026.webp)
FOCKE MELER GLUING SOLUTIONS
3-6
INSTALLATION
Among the various parameters, it is necessary to program the set point
temperature values for each component connected and the value for
overheating warnings. There are two other parameters (weekly start-up and
shut-down programming and the standby temperature value) left to program
in advanced systems, although the factory default values are perfectly valid for
operational purposes.
Programming working temperatures
The melters leave the factory with the following set point temperatures:
• 160 °C (320 °F) for the tank, premelter and the distributor.
• 150 °C (302 °F) for hoses.
• 160 °C (320 °F) for applicators.
The general process for modifying set up temperature values for any
component is described below.
1. Select the component for which you wish to modify the value with the
left-right arrow.
The corresponding LED will blink quickly.
2. Using the up-down arrow, select the desired value for the set point
temperature.
3. After ten seconds, the LED will stop blinking and the display will
change by default to the set point temperature, saving the changed
data.
This simple process must be repeated for each one of the components
installed on the melter.
Selecting the overheating value
1. Press the buttons with the clock symbol and the down arrow at the
same time to enter the special menu.
The choice of display units (ºC or ºF) will appear on the display.
2. Using the right arrow, we advance to the next screen where the
overheating symbol appears.
3. Select the desired value with the up-down arrow.
1 6 0
1 6 0
1 6 0
1 6 0
º C
º C
--
-- --
1 0
1 0
Содержание Macro Series
Страница 1: ...MA 5052 ENG 221220 GLUING SOLUTIONS ADHESIVE MELTER MACRO SERIES INSTRUCTIONS MANUAL ...
Страница 8: ...FOCKE MELER GLUING SOLUTIONS TABLE OF CONTENTS This page is intentionally left blank ...
Страница 16: ...FOCKE MELER GLUING SOLUTIONS 2 4 INTRODUCTION Main components 10 10 12 14 13 11 15 1 2 3 7 6 8 9 4 5 5 ...
Страница 32: ...FOCKE MELER GLUING SOLUTIONS 3 12 INSTALLATION This page is intentionally left blank ...
Страница 58: ...FOCKE MELER GLUING SOLUTIONS 4 26 MELTER OPERATION This page is intentionally left blank ...
Страница 66: ...FOCKE MELER GLUING SOLUTIONS 5 8 MAINTENANCE This page is intentionally left blank ...
Страница 70: ...FOCKE MELER GLUING SOLUTIONS 6 4 TECHNICAL CHARACTERISTICS This page is intentionally left blank ...
Страница 71: ...ELECTRICAL DRAWINGS 7 1 MA 5052 ENG MACRO SERIES MELTER MANUAL 7 ELECTRICAL DRAWINGS ...
Страница 72: ...FOCKE MELER GLUING SOLUTIONS 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Страница 74: ...FOCKE MELER GLUING SOLUTIONS 8 2 PNEUMATIC DIAGRAMS This page is intentionally left blank ...
Страница 82: ...FOCKE MELER GLUING SOLUTIONS 9 8 SPARE PARTS LIST This page is intentionally left blank ...