background image

Page 6

S

ECTION

 3 - I

NSTALLATION

3.4 Connecting a Feeding Trough (if so

equipped)

Waste pulpers intended for use with a feeding
trough are equipped with a short trough
section at the load end of the machine. This
section incorporates a cutlery catch box,
magnet, and a mating plate. The end of the
trough (supplied by others), when constructed
to drawings supplied by Meiko, will
incorporate a matching plate to allow for
connection to the pulper.

Figure 3-2: Trough connection

AZP 80

Short trough

section (supplied

with AZP 80)

Customer-

supplied

trough

Magnet

Clamp fits over

rubber boot

Customer-supplied

recirculating water

line (2” OD)

Gasket

(supplied with

AZP 80)

1. Attach the trough using qty. 13 hex bolts,

flat washers, lockwashers and hex nuts
as shown in Figure 3-2. Be sure to install
the supplied gasket between the mating
surfaces. Seal the connection with silicone
sealant to prevent water leakage.

2. Attach the recirculating water line to the

machine’s 2” OD pipe connection using
the supplied clamp and rubber boot.

Содержание AZP 80

Страница 1: ...ODEL AZP 80 Rev 07 07 Meiko 1349 Heil Quaker Boulevard La Vergne TN 37086 Phone 615 399 6600 800 55 MEIKO Fax 615 399 6620 Waste Pulper USA Version OWNER S INSTALLATION OPERATION AND MAINTENANCE MANUA...

Страница 2: ...WILL IMMEDIATELY VOID THE MANUFACTURER S WARRANTY TABLE OF CONTENTS 4 OPERATION 12 4 1 Location and Description of Controls 12 4 2 Startup 13 4 3 Loading 14 4 4 Idle Periods 14 4 5 Clearing Jams 15 4...

Страница 3: ...ew As the screw rotates inside the cylinder the ground waste is pressed against the perforations which removes water from the waste compacts it and lifts it Separated water escapes through the perfora...

Страница 4: ...es Connecting the drain line and routing it to an appropriately sized floor drain Installing a deodorizing system if so equipped following the manufacturer s instructions Contacting your MeikoAuthoriz...

Страница 5: ...er movement to the installation location 2 Check for shipping damage as described in Section 2 Transport and Shipping If damage is present call Meiko Customer Service at 1 800 868 3840 providing full...

Страница 6: ...low for connection to the pulper Figure 3 2 Trough connection AZP 80 Short trough section supplied with AZP 80 Customer supplied trough Magnet Clamp fits over rubber boot Customer supplied recirculati...

Страница 7: ...ines Right to Left Machines SECTION 3 INSTALLATION 3 5 Accessing the Utility Connections The utility connections for the machine are shown in Figure 3 3 Dual valve connection Cold water Single valve c...

Страница 8: ...e 3 4 Main electrical supply connections GND ground L1 L2 and L3 hot line Internal chassis ground Do not connect supply ground to this terminal block 3 7 Remote Control Box Installation if so equipped...

Страница 9: ...the front of the machine is used for the recirculating water supply and should use cold water 50 F 10 C recommended The single valve connection located behind the dual valve connection is used as a wa...

Страница 10: ...2 If possible the machine drain can simply be positioned directly above a floor drain as shown in Figure 3 12 3 If a floor drain is not directly beneath the machine drain or if local codes require a t...

Страница 11: ...an external feeding trough water will begin to flow through the trough after a few seconds 13 Test the machine by feeding waste into either the manual feeding opening or the recirculating feeding trou...

Страница 12: ...1 Location and Description of Controls The dishwasher controls are on the loading end of the machine See Figure 4 1 Figure 4 1 Waste pulper controls Left to Right Machines Right to Left Machines Drain...

Страница 13: ...mpleted the light will turn off F EMERGENCY STOP button Shuts down the machine immediately After it is pressed the EMERGENCY STOP button must be pulled back out to reset it before the machine will ope...

Страница 14: ...uld be opened and loaded empty Any remaining waste inside them should be emptied into the machine first Any floating waste Styrofoam etc will take longer to grind and process reducing the efficiency o...

Страница 15: ...r the wooden handle of a broom or mop To return the machine to operation follow the procedure in Section 4 2 Startup WARNING Before opening the access door press the OFF button to stop the machine Tan...

Страница 16: ...ending on the type of waste being processed and the amount of buildup on the cutting wheel it may be necessary to perform these steps on a more frequent basis 1 Open the tank access door 2 Thoroughly...

Страница 17: ...d perforated cylinder to air dry thoroughly overnight 8 Reassemble the screw into the perforated cylinder 9 Replace the screw perforated cylinder assembly into the tower Note that the flange on the bo...

Страница 18: ...agent that is used After the deliming procedure allow the machine to run for at least 10 15 minutes to rinse the interior thoroughly SECTION 5 CLEANING Press the STOP OPERATION button to engage the a...

Страница 19: ...ed in Section 5 2 Weekly Cleaning Water exits the waste chute Check if large quantities of oil and grease are in the waste mix These wastes can interfere with proper operation Refer to Section 4 3 Loa...

Страница 20: ...pulper should provide years of trouble free operation If service is necessary contact your local Meiko Authorized Service Agent With factory training OEM parts and direct support from the factory Mei...

Отзывы:

Похожие инструкции для AZP 80