A S 5 0 0 0 S E R V I C E M A N U A L
32
Fig. 8-47 Remove the Heater (Step 4)
Fig. 8-48 Proper direction for orange tab to face when replacing
Heater (Step 5)
8.14 Replacing Flowmeter
Tools and supplies required:
• flat blade screwdriver
• small flat blade screwdriver
• wire cutters
1. Remove internal components from the Chiller frame and
separate them into two sections (Steps 8.6, 8.7, or 8.8).
2. Remove Circulation Pump as described in step 8.10.
3. Remove insulation covering the Flowmeter.
4. Unscrew the Flowmeter tube from the pump.
5. When installing a new Flowmeter, note that there is a white
arrow on the Flowmeter that indicates direction of flow. It needs
to be pointed away from the pump.
6. Re-insulate the Flowmeter.
Fig. 8-49 Flowmeter and cable
Fig. 8-50 Flowmeter with arrow indicating direction of flow;
same direction as Circulation Pump output
8.15 Replacing Control Panel
Tools and supplies required:
• 7/16” nut driver
1. Remove Back Panel (Step 8.3).
2. Remove Outer Shell (Step 8.4).
3. From the inside of the Outer Shell, using the 7/16” nut driver,
remove the four bolts holding the Control Panel to the shell.
4. Press the Control Panel outward.
5. When replacing, gently set the new Control Panel into place and
tighten bolts.