25
Battery Insertion Self test
When the battery is installed or replaced, the AED automatically starts the battery
insertion self test. After battery insertion self test is completed, the AED sounds voice
prompt “Unit ok”, the status indicator displays “O” and power of the AED is automatically
turned off. If the battery insertion self test is not completed successfully, the AED sounds
voice prompt
“Unit fail” and the status indicator displays “X”. If the AED does not function
properly, do not use the AED. Instead, contact qualified service personnel or your local
supplier.
You can also skip the battery insertion self test, try following procedure
Closed: skip by opening the cover.
Opened: skip by pressing the shock button.
After finishing this procedure, the AED will perform the power on self test as when user
turns on the AED.
Note: Self test is not able to determine if the battery and the pads currently inserted in the
AED are within their use by date. You must remember to check the use by date on
the pads and standby life on the battery regularly.
Содержание HeartOn A15
Страница 8: ...8 This page is intentionally left blank...
Страница 14: ...14 This page is intentionally left blank...
Страница 20: ...20 This page is intentionally left blank...
Страница 26: ...26 This page is intentionally left blank...
Страница 40: ...40 This page is intentionally left blank...