
Initial operation
Mounting
18
GA 5752 2135 GB 18
3
3.2.2
Connection to the terminal unit
3.2.2.1
General
NOTE
Please refer to the manufacturer’s instructions for the particular terminal unit for
information on connecting the gas probe to the terminal unit.
3.2.2.2
Version A
11
22
Fig. 4: Version A
Tapping unit with integrated gas pin
The tapping unit (1) is plugged directly into
the terminal unit (2).
3.2.2.3
Version B
22
11
33
44
66
55
88
77
Fig. 5: Version B
Tapping unit with rail clamp and NIST
connection
With the upper edge of the guide groove at
the front, position the rail clamp (1) at a
slight angle on the equipment rail (2) and
then press it against the equipment rail and
allow it to click into place.
Make sure that the rail clamp is correctly
secured and that the tapping unit is in a
stable position on the equipment rail. The
locking lever (3) must be flush with the rail
clamp.
Insert the NIST nipple (4) of the connection
tube into the NIST connection (5) of the
tapping unit and tighten down the NIST
screw connection (6) by hand.
Plug the gas probe (7) of the connection
tube into the terminal unit (8).
Содержание FINA VAC D 150
Страница 1: ...OPERATING INSTRUCTIONS TAPPING UNIT FOR DRAINAGE MEDAP FINA VAC D 150 GA 5752 2135 GB 18...
Страница 33: ...Notes...
Страница 34: ...Notes...
Страница 35: ...Notes...