
Overview
21
Getting Started Procedure
illustrates the steps needed to get started using a DT3010
Series board. This diagram is repeated in each getting started chapter; the shaded area in the
diagram shows you where you are in the getting started procedure.
Figure 1: Getting Started Flow Diagram
Install the Board and Load the Device
Wire Signals
Verify the Operation of the Board
Attach and Configure the Screw Terminal
Panel (see
)
Содержание Data Translation DT3010 Series
Страница 2: ...DT3010 Series UM 16866 V User s Manual Title Page ...
Страница 5: ......
Страница 15: ...About this Manual 14 ...
Страница 16: ...15 1 Overview Features 16 Supported Software 18 Accessories 19 Getting Started Procedure 21 ...
Страница 23: ...Chapter 1 22 ...
Страница 24: ...Part 1 Getting Started ...
Страница 25: ......
Страница 37: ...Chapter 2 36 ...
Страница 49: ...Chapter 3 48 ...
Страница 91: ...Chapter 4 90 ...
Страница 102: ...Part 2 Using Your Board ...
Страница 103: ......
Страница 147: ...Chapter 6 146 ...
Страница 159: ...Chapter 7 158 ...
Страница 160: ...159 8 Calibration Calibrating the Analog Input Subsystem 161 Calibrating the Analog Output Subsystem 169 ...
Страница 176: ...175 9 Troubleshooting General Checklist 176 Technical Support 178 If Your Board Needs Factory Service 179 ...
Страница 181: ...Chapter 9 180 ...
Страница 193: ...Appendix A 192 ...
Страница 213: ...Appendix B 212 ...
Страница 231: ...Index 230 ...