15
c
.
Place the top cover and secure with screws.
Note:
:
M3
*
3
.
3
Screws each from left and right
Top cove screws
:
M3
*
6
e
.
Apply AC power to the NMP unit, and measure the output voltages to ensure each module is fucntinoing properly. Also, make sure
the output voltage difference between slot 1 and slot 2 is less than 0.2V.
Use two 2-unit parallel copper plates accessory, FAP-009, to connect the +V and -V terminals of slot 1 and slot 2, and use accessory,
and GND pins of CN81 in parallel.
d
.
Apply the corresponding product model label to the Front-End top cover.
,
SLOT1
2
3
4
5V
36A
12V
20A
24V
10A
24V
10A
SLOT1
SLOT2
SLOT3
SLOT4
-
V
+
V
CN81
48V
5A
SLOT5
SLOT6
5
6
10
,
10
,
10
1
2
SLOT1
2
3
4
5V
36A
12V
20A
24V
10A
24V
10A
SLOT1
SLOT2
SLOT3
SLOT4
CN81
SLOT5
48V
5A
SLOT6
5
6
-
V
+
V
Содержание NMP1K2
Страница 1: ...NMP650 1K2 Instruction Manual...
Страница 21: ...No 28 Wuquan 3rd Rd Wugu Dist New Taipei City 248 Taiwan...