background image

 

 

 

 

 

 

Screw 

figure F 

Roof 

panel (1) 

 

panel (1) 

 
 
 
 
 
 

foam 

Tape (10) 

(8) 

figure G 

Roof 

Screw 

(8)  

 

 

 

 

 

 

 

2.  

With the Panel (1) lined up with the marks, attach the panel to the   rst frame section,  

 

using the Screws (8) in three places in the center of the end side, as shown in 

figure  

f

.  Do not add screws along the edges yet, until the panels next to it are in place.  

3. 

Run strips of Tape (10) across the edges of the panel, where other panels will join to 
it. 

4. 

Slide the lower Panel (1) under the edges of the Panel above. Make sure the lower 
Panel is square with the Panel above, then install Screws (8) on all edges where another 
panel will not connect, as shown in 

figure g

5. Remember 

to 

seal 

each two Panel connection using Tape (10). 

6. 

Install all panels in a similar fashion, securing all parts with screws.  Install the panels 
from the peak down. 

7. 

When  nished installing the Panels (1), run a length of Edge Trim (9) along all exposed 
edges of the roof panels. Install the Trim with its longer edge on top/outside and its 
short edge on bottom/inside. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

SKU 95913     

Please DO NOT return unit to store or dealer. For all questions or shortages please contact        

PAGE 7

 

Customer Service at: 800-447-7079 or 203-877-7070

 

 

Содержание SC071008JJ

Страница 1: ......

Страница 2: ...all instructions before using this tool 1 Keep assembly area clean and well lit Cluttered and dark areas invite accidents 2 Stay alert Watch what you are doing and use common sense when operating tool...

Страница 3: ...ow debris accumulation hazard The heavy weight of accumulated snow or other debris can cause parts of this Shelter to buckle suddenly Do not allow debris to ac cumulate on top of the Shelter If snowfa...

Страница 4: ...age and injury in the event of strong winds or inclement weather Wind and ground conditions may vary from site to site and may affect the practicality and effectiveness of anchoring methods substantia...

Страница 5: ...gure A Assembling the Arches 1 Before assembling the arches stack the Peak Tubes 2 Line up their ends and mark a line on the top of each Peak Tube 13 4 from one end This will be the location of the ed...

Страница 6: ...ility lines Securing methods will vary drastically depending on the type of foundation used If in doubt about the stability or practicality of a particular method consult a profes sional To secure the...

Страница 7: ...ake sure the lower Panel is square with the Panel above then install Screws 8 on all edges where another panel will not connect as shown in figure g 5 Remember to seal each two Panel connection using...

Страница 8: ...nual should only be performed by a quali ed service technician 1 before each use Inspect the general condition of the Shelter Check for damaged parts loose hardware and any other condition that may af...

Страница 9: ...OR SHE IS QUALIFIED TO MAKE ANY REPAIRS TO THE PRODUCT OR THAT HE OR SHE IS QUALIFIED TO REPLACE ANY PARTS OF THE PRODUCT IN FACT THE MANUFACTURER AND OR DISTRIBUTOR EXPRESSLY STATES THAT ALL REPAIRS...

Страница 10: ...rd month and year of purchase instead note Some parts are listed and shown for illustration purposes only and are not available individually as replacement parts SKU 95913 Please DO NOT return unit to...

Отзывы: