background image

 

 

ICE FOG

 

Q

TM

 

User Guide, Revision A/d, May 2017 

13 / 16

 

TECHNICAL DIMENSIONS 

 
 

 

 

Содержание ICE FOG Q

Страница 1: ...E IN CAN A D A F A B R IQU AU CA N A D A 10301 avenue Pelletier Montr al Qu bec Canada H1H 3R2 Tel 514 272 6040 800 663 3020 Fax 514 722 3229 www mdgfog com e mail info mdgfog com ICE FOG Q TM Low Fo...

Страница 2: ...ICE FOG QTM User Guide Revision A d May 2017 2 16 Intentionally left blank...

Страница 3: ...well as the MDG Low Fog Fluid We hope it will bring you long hours of satisfaction This product is available in many versions to satisfy the needs of our professional users PLEASE READ THE FOLLOWING...

Страница 4: ...types of electronic fail safe systems are designed to protect against over and under heating conditions and against component failure The temperature is maintained within a narrow margin the HEAT yell...

Страница 5: ...indicates that the liquid CO2 solenoid valve is on Fog Output Delay Delay of 3 to 30 seconds Allowing to cool down the cold chamber of the Generator Fog Output adjustment Pressure regulator Gauge Max...

Страница 6: ...Fog switch with a Green LED indicator Power switch with the Red LED HEAT yellow LED indicator 1 The LED turns on and off from time to time to indicate the control of temperature 2 The LED will start b...

Страница 7: ...d May 2017 7 16 Optional Accessories DMX M35AX Optional 2 Channel DMX Interface IF35 RCT Optional Remote Control Timer Refrigerated Low pressure Liquid Carbone Dioxide L CO2 Container Dewar 230 Litres...

Страница 8: ...ylinder and regulator must be compliant with the Pressure Vessel Directive In North America the gas cylinder must be manufactured inspected and tested in accordance with U S Department of Transportati...

Страница 9: ...nerator CAUTION DISCONNECT UNIT BEFORE ADDING FOG FLUID DEPRESSURIZE THE FLUID RESERVOIR BY TURNING OFF THE PRESSURE SWITCH LOCATED ON THE BACK PANEL OF THE GENERATOR To fill the fluid reservoir unscr...

Страница 10: ...he start of the heating cycle which will last approximately 10 minutes When the temperature reaches a pre adjusted level called the READY level indicated by a green LED the HEAT yellow LED will turn o...

Страница 11: ...ed Always turn off the fog emission Wait for the purge cycle to complete Power off the Fog generator by switching off the MAIN POWER SWITCH or by removing the MAIN POWER If not use for a long period A...

Страница 12: ...180 L 48 US gallon Canister DEWAR 70 minutes Warm up time maximum 8 minutes Fluid type MDG Low Fog Fluid M S D S available on request Operating voltage 208 VAC 1 or 230 VAC 50 60 Hz Power consumption...

Страница 13: ...ICE FOG QTM User Guide Revision A d May 2017 13 16 TECHNICAL DIMENSIONS...

Страница 14: ...MDG Fog Generators Ltd will repair or replace it free of all charges except transportation costs This warranty applies only to the product itself and MDG Fog Generators Ltd declines responsibility for...

Страница 15: ...ICE FOG QTM User Guide Revision A d May 2017 15 16 DECLARATION OF CONFORMITY...

Страница 16: ...ICE FOG QTM User Guide Revision A d May 2017 16 16 NOTE...

Отзывы: