Mustang Dynamometer
MD-AWD-150
Page 30
For the control system installation you will need the contents of box # 3 (the box you found this
manual in), Monitor, PC, and you will need to install the PowerDyne control box.
NOTE: There is only 30 feet of cable supplied with the dynamometer so double check the
placement of the PowerDyne control box to the placement of your dynamometer.
4.7.1 Control System Installation Procedure
1. Take the “dummy” load cell out by removing the large bolts from the upper and lower
load cell brackets. Attach the load cell on the lower bracket first. Upon completion,
attach the load cell to the upper bracket. Tighten both bolts to 50 ft.-lbs. Torque the
eyelet bolt jam nuts to 200 in.-lbs. DO NOT OVER TIGHTEN! NOTE: Position the load
cell so the wire is on the side opposite the Power Absorbing Unit.
2. Route cabling and air line. Leave enough slack in the cables and the air line so that the
appropriate connections can be made.
3. After routing the air line, push the plastic air line into the quick release air fitting on the
air solenoid until it is snug. Make sure that the air line will not come into contact with
the rolls.
Содержание MD-AWD-150
Страница 1: ...Mustang Dynamometer MD AWD 150 Page 1 MD AWD 150 SERIES MANUAL REV A ...
Страница 29: ...Mustang Dynamometer MD AWD 150 Page 29 INSTALLATION ILLUSTRATIONS 4 7 CONTROL INSTALLATION ...
Страница 40: ...Mustang Dynamometer MD AWD 150 Page 40 ...
Страница 49: ...Mustang Dynamometer MD AWD 150 Page 49 APPENDIX C ANCHOR POD INSTALLATION NEW FLOORS fl ...