
Mustang Dynamometer
MD-AWD-150
Page 20
4.4.2
Electrical
Your new dynamometer will require the following electrical services to operate. A 115
VAC, single phase, 15 Amp circuit is required for the host computer system located on
the roll-around cart.
For the single PAU configuration you will need 230VAC, Single Phase, 40Amps
Two (2) PAU configuration you need 230VAC, Three Phase, 40Amps
Your local electrical codes will determine how these circuits should be wired
.
4.4.3 Pneumatic (air)
The Dynamometer requires an air supply line to operate the roll brake systems, the
movable base locking system and for the air on/off couplings. The airline should supply
at least 100 psi but not more than 120 psi. An air dryer and regulator needs be
installed in the main supply line.
4.4.4
Ventilation
Your shop should be equipped with an effective ventilation system to direct tailpipe
emissions to the outside air. Exhaust vents should be able to connect to all types of
vehicles (front-wheel drive, rear-wheel drive, dual exhaust, etc.)
4.4.5 Floor Anchors
It is common for vehicles to move laterally on the rolls during dynamometer operation.
To prevent personal injury and damage to the vehicle it is imperative that the vehicle is
secured with chains or straps. The dynamometer (belowground only) is shipped with
floor anchor pods that must be permanently installed as illustrated in the Appendix.
4.4.6
Clearance
It is important to have enough room around the dynamometer to allow equipment to be
move around the service bay area. At least 18 feet clearance is needed in front of the
dynamometer so that the vehicle under test has enough room to pull in the service bay.
Содержание MD-AWD-150
Страница 1: ...Mustang Dynamometer MD AWD 150 Page 1 MD AWD 150 SERIES MANUAL REV A ...
Страница 29: ...Mustang Dynamometer MD AWD 150 Page 29 INSTALLATION ILLUSTRATIONS 4 7 CONTROL INSTALLATION ...
Страница 40: ...Mustang Dynamometer MD AWD 150 Page 40 ...
Страница 49: ...Mustang Dynamometer MD AWD 150 Page 49 APPENDIX C ANCHOR POD INSTALLATION NEW FLOORS fl ...