Heat Section Installation (Size 019)

Figure 7 shows the heat section installed in a standard wall

box. Note that the heat section slides into a wall box on the

slide rails. For heat section installation, proceed as follows:

1.  Remove heat section from shipping carton.

2.  Visually check for shipping damage and report any 

visible damage immediately to the trucker. Spin blower 

wheels by hand to assure they do not rub within their 

housing. Shipping may have loosened mounts. Adjust as 

required.

3.  Check voltage rating on data plate fastened to heat

 

section. This must conform to voltage supplied for the

 

equipment.

4.  Locate slide rails on each side of wall box and insert 

heater section into the wall box. Slide to the rear until it 

is firmly seated.

5.  Screw in the heat section lock screws as shown in Figure

 

7. (Screws are shipped with the heat section.)

Figure 7: Heat Section Installed in Wall Box

Steam or Hot Water Application (Size 019)

When the heat section requires steam or hot water, the

installation varies. See Figures 9 and 10 for suggested piping

arrangements.

1.  Supply and return piping for steam or hot water is 

supplied from right-hand side only. Hot water must be 

supplied to the bottom of the coil, and steam to the top of 

the coil.

2.  To simplify the steam or hot water connections to the 

coil, use 5/8'' O.D. copper tubing where local codes 

permit. See Figure 8 for rough-in dimensions.

3.  When hot water is to be used, an air vent must be put in 

at the highest point in the piping connection. See Figure 

9. If the air vent used is not of the automatic type, it 

should be piped so that it may be easily opened.

4.  A shutoff valve is recommended on the supply and return

 

side of the coil. A steam trap is required on the return 

side when steam is used for heating. See Figure 10.

5.  All steam or hot water lines which are located within the

 

room cabinet should be insulated. 

If the heat section is used for heating an area during construction, 

specifically plastering, precautions must be taken to protect the 

equipment by using covers of corrugated board, sheet metal or 

plywood. If the installation specifies heat only, be sure to install 

permanent weather panel and filter adapter (see “Installation of 

Heating Only Option”). Failure to heed this warning can cause 

malfunction of the equipment.

Figure 8: Rough-in Piping Connections Locations

Figure 9: Hot Water Coil

Figure 10: Steam Coil

  WARNING

!

Содержание Incremental Packaged Terminal

Страница 1: ...Incremental Packaged Terminal Air Conditioner Incremental Room Conditioner with R 410A Refrigerant Group PTAC Part No 669729001 Date March 2010 Installation Maintenance Data IM 1068 2010 McQuay Intern...

Страница 2: ...thisequipmentshallbeinaccordancewiththe regulations of authorities having jurisdiction and all applicable codes It is the responsibility of the installer to determine and follow the applicable codes S...

Страница 3: ...9000 Voltage A 115 60 1 C 208 60 1 G 230 60 1 J 277 265 60 1 S 208 115 60 1 R 265 115 60 1 Coil Options Z None Heating Options 35 2 5 kW nominal 41 3 5 kW nominal 44 4 0 kW nominal 48 5 0 kW nominal 5...

Страница 4: ...floor line to clear obstructions Without cabinet modifications the wall box can be placed up to 1 25mm abovethefloor Thestandardadjustablekickplatecan be telescoped to hide the space below the wall b...

Страница 5: ...nstructions will vary by depth of wall but not by wall material Do not remove the weather panel at any time during the installation of the wall box Premature removal of this panel could result in impr...

Страница 6: ...e Type K cooling chassis but packaged and shipped separately Check the heat section carton label and the unit s nameplate to ensure it is correct for the cooling chassis and the space The following st...

Страница 7: ...exposed water or steam lines that are located within the room cabinet Failure to do this may cause erratic operation of the thermostat 10 Protect the heat section from damage during construction Do n...

Страница 8: ...turn piping for steam or hot water is supplied from right hand side only Hot water must be supplied to the bottom of the coil and steam to the top of the coil 2 To simplify the steam or hot water conn...

Страница 9: ...e condenser fan wheel to be sure that there is no interference or looseness If it is loose tighten the setscrew located over the center of the flat on the motor shaft Do not lubricate condenser fan mo...

Страница 10: ...e the equipment is connected to the proper power supply and that proper fusing is used 2 In cases where a number of conditioners are to be installed single circuits should be provided for each machine...

Страница 11: ...H Edge of Wall Box Long Control Box Cool Chassis Power Cord Heat Section Power Cord Wall Box End View w o Cabinet B A H D F G 91 4 203 mm Figure 13 Electric Heat Section Size 019 Notes Guest room con...

Страница 12: ...Sizes 007 012 The hydronic heat section can be supplied with a short 4 high control box or a long 13 high control box depending on the number of options selected Observe the control box to determine w...

Страница 13: ...ion B The long control box is used with optional special controls such as Guest Room Control GRC Night Setback NSB and remote thermostats Note Left hand piping must be used with the long control box d...

Страница 14: ...at section and cool chassis and push the cabinet firmly against the wall The discharge grille seals should rest on the discharge opening of the heat section For unit size 019 Position the room cabinet...

Страница 15: ...Start up Initial start up of the McQuay equipment by an experienced person is usually the responsibility of the installing contractor This consists of inspecting and operating the equipment for all f...

Страница 16: ...slave unit as shown in Figure 22 The master unit is furnished with a 50 VA transformer that is capable of handling up to 7 slave units If additional slave units are to be added a larger field supplie...

Страница 17: ...Setback NSB R4 Relay Guest Room Control GRC R5 Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S1 Control Switch S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transform...

Страница 18: ...P4 Plug on Master Wire Harness P5 Plug on Master Wire Harness R1 Relay Run R2 Relay Outdoor Fan Motor R3 Relay Cooling R4 Relay Indoor Fan Motor R5 Relay Heating 1st Stage R6 Relay Heating 2nd Stage...

Страница 19: ...R4 Relay Guest Room Control GRC R5 Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S1 Control Switch S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transformer TB1 Term...

Страница 20: ...Master Wire Harness R1 Relay Run R2 Relay Outdoor Fan Motor R3 Relay Cooling R4 Relay Indoor Fan Motor R5 Relay Heating 1st Stage R6 Relay Heating 2nd Stage R7 Relay Night Setback NSB R9 Relay Hot Wa...

Страница 21: ...4 Relay Guest Room Control GRC R5 Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S1 Control Switch S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transformer TB1 Termin...

Страница 22: ...n Master Wire Harness R1 Relay Run R2 Relay Outdoor Fan Motor R3 Relay Cooling R4 Relay Indoor Fan Motor R5 Relay Heating 1st Stage R6 Relay Heating 2nd Stage R7 Relay Night Setback NSB R9 Relay Hot W...

Страница 23: ...ol GRC R5 Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transformer TB1 Terminal Block Control Box TB2 Terminal Board 24...

Страница 24: ...Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S1 Control Switch S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transformer TB1 Terminal Block Control Box TB2 Terminal...

Страница 25: ...R5 Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S1 Control Switch S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transformer TB1 Terminal Block Control Box TB2 Termin...

Страница 26: ...oil lightly to enhance dust collecting ability The Type K is also available with a carbon filter a zeolite filter or electrostatic filter The electrostatic filter is renewable by rinsing with hot wate...

Страница 27: ...fective part can then be returned to McQuay International or one of its authorized service stations So long as it is still in warranty it is repaired or replaced and returned to the owner without cost...

Страница 28: ...a short interval 4 Blowers run on Cool and compressor starts and runs but compressor occasionally stops on overload device 5 Compressor starts and runs on Cool but blowers do not run 6 Compressor star...

Страница 29: ...a short circuit or a grounded condition in the circuit c Replace d Replace wire or tighten e Adjust rotate knob to Warm f Replace g Replace h 1 Temporarily lock valve open replace 2 Replace 8 Insuffic...

Страница 30: ...Control Size 007 65 lbs Size 009 65 lbs Size 012 65 lbs Size 019 77 lbs Electric Heat Section With Control Size 007 60 lbs Size 009 60 lbs Size 012 60 lbs Size 019 70 lbs Wall Box With Rear Extension...

Страница 31: ...IM 1068 Page 31 of 32...

Страница 32: ...ranty details Refer to Form 933 43285Y To find your local McQuay Representative go to www mcquay com This document contains the most current product information as of this printing For the most up to...

Отзывы: