background image

IM 1068 / Page 14 of 32

Room Cabinet and Control Installation

The depth of the room cabinet varies by the amount the wall

box extends into the room. Check the unit tagging against the

room cabinet tagging to be sure they match. Installation of the

control box should be done at the same time as the room

cabinet.

1.  Remove the cabinet from the carton and inspect it for

 

damage. If any is found, contact the carrier immediately.

 

The room cabinet is made up of six pieces: a cabinet, a

 

removable front panel, a discharge grille, two (2) end

 

plates, and a kickplate. Make sure all pieces are included

 

with the room cabinet (Figure 18).

 

Remove the front panel by lifting it slightly and pulling 

forward, then upwards and out from the surrounding 

cabinet. Unit size 019 utilizes safety chains that must be 

disconnected from the room cabinet in order to remove 

the front panel. 

 

If necessary, remove the tie bar located at the bottom of 

the front panel, unlock the latch at each end and lift the 

bar out (Figure 17)

Figure 17: Release Concealed Latch

2. 

For unit sizes 007–012: 

 

Place the cabinet around the installed wall box, heat 

section and cool chassis and push the cabinet firmly 

against the wall. The discharge grille seals should rest on 

the discharge opening of the heat section.

 

For unit size 019: 

 

Position the room cabinet over the heat section so that the 

two studs on each side are positioned over the matching 

slots in the heat section. Set the cabinet down on the heat 

section, push tight against the wall and secure using wing 

nuts supplied. See Figure 18.

3.  Fasten the cabinet to the wall using appropriate fasteners.

 

The back flanges of the room cabinet have factory

 

furnished holes for securing the cabinet to the wall.

Figure 18: Unit Cabinet Assembly Details

4.  Fasten the two (2) end plates to the room cabinet using

 

the wing nuts supplied. These end plates are adjustable

 

and should be positioned to set flat on the finished floor

 

(Figure 19).

Figure 19: Unit Cabinet Assembly Details

5.  Locate the kick plate and clip it into the slots provided in

 

the end plates so that the flange is toward the floor.

6.  Take the control box and escutcheon plate out of the

 

carton for attachment to the room cabinet.

7.  There are two flanges beneath the control door that

 

support the control box (Figure 20). Remove the two

 

screws in the control box that hold the escutcheon plate

 

in place. Remove the thermostat knob and escutcheon

 

plate.

Содержание Incremental Packaged Terminal

Страница 1: ...Incremental Packaged Terminal Air Conditioner Incremental Room Conditioner with R 410A Refrigerant Group PTAC Part No 669729001 Date March 2010 Installation Maintenance Data IM 1068 2010 McQuay Intern...

Страница 2: ...thisequipmentshallbeinaccordancewiththe regulations of authorities having jurisdiction and all applicable codes It is the responsibility of the installer to determine and follow the applicable codes S...

Страница 3: ...9000 Voltage A 115 60 1 C 208 60 1 G 230 60 1 J 277 265 60 1 S 208 115 60 1 R 265 115 60 1 Coil Options Z None Heating Options 35 2 5 kW nominal 41 3 5 kW nominal 44 4 0 kW nominal 48 5 0 kW nominal 5...

Страница 4: ...floor line to clear obstructions Without cabinet modifications the wall box can be placed up to 1 25mm abovethefloor Thestandardadjustablekickplatecan be telescoped to hide the space below the wall b...

Страница 5: ...nstructions will vary by depth of wall but not by wall material Do not remove the weather panel at any time during the installation of the wall box Premature removal of this panel could result in impr...

Страница 6: ...e Type K cooling chassis but packaged and shipped separately Check the heat section carton label and the unit s nameplate to ensure it is correct for the cooling chassis and the space The following st...

Страница 7: ...exposed water or steam lines that are located within the room cabinet Failure to do this may cause erratic operation of the thermostat 10 Protect the heat section from damage during construction Do n...

Страница 8: ...turn piping for steam or hot water is supplied from right hand side only Hot water must be supplied to the bottom of the coil and steam to the top of the coil 2 To simplify the steam or hot water conn...

Страница 9: ...e condenser fan wheel to be sure that there is no interference or looseness If it is loose tighten the setscrew located over the center of the flat on the motor shaft Do not lubricate condenser fan mo...

Страница 10: ...e the equipment is connected to the proper power supply and that proper fusing is used 2 In cases where a number of conditioners are to be installed single circuits should be provided for each machine...

Страница 11: ...H Edge of Wall Box Long Control Box Cool Chassis Power Cord Heat Section Power Cord Wall Box End View w o Cabinet B A H D F G 91 4 203 mm Figure 13 Electric Heat Section Size 019 Notes Guest room con...

Страница 12: ...Sizes 007 012 The hydronic heat section can be supplied with a short 4 high control box or a long 13 high control box depending on the number of options selected Observe the control box to determine w...

Страница 13: ...ion B The long control box is used with optional special controls such as Guest Room Control GRC Night Setback NSB and remote thermostats Note Left hand piping must be used with the long control box d...

Страница 14: ...at section and cool chassis and push the cabinet firmly against the wall The discharge grille seals should rest on the discharge opening of the heat section For unit size 019 Position the room cabinet...

Страница 15: ...Start up Initial start up of the McQuay equipment by an experienced person is usually the responsibility of the installing contractor This consists of inspecting and operating the equipment for all f...

Страница 16: ...slave unit as shown in Figure 22 The master unit is furnished with a 50 VA transformer that is capable of handling up to 7 slave units If additional slave units are to be added a larger field supplie...

Страница 17: ...Setback NSB R4 Relay Guest Room Control GRC R5 Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S1 Control Switch S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transform...

Страница 18: ...P4 Plug on Master Wire Harness P5 Plug on Master Wire Harness R1 Relay Run R2 Relay Outdoor Fan Motor R3 Relay Cooling R4 Relay Indoor Fan Motor R5 Relay Heating 1st Stage R6 Relay Heating 2nd Stage...

Страница 19: ...R4 Relay Guest Room Control GRC R5 Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S1 Control Switch S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transformer TB1 Term...

Страница 20: ...Master Wire Harness R1 Relay Run R2 Relay Outdoor Fan Motor R3 Relay Cooling R4 Relay Indoor Fan Motor R5 Relay Heating 1st Stage R6 Relay Heating 2nd Stage R7 Relay Night Setback NSB R9 Relay Hot Wa...

Страница 21: ...4 Relay Guest Room Control GRC R5 Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S1 Control Switch S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transformer TB1 Termin...

Страница 22: ...n Master Wire Harness R1 Relay Run R2 Relay Outdoor Fan Motor R3 Relay Cooling R4 Relay Indoor Fan Motor R5 Relay Heating 1st Stage R6 Relay Heating 2nd Stage R7 Relay Night Setback NSB R9 Relay Hot W...

Страница 23: ...ol GRC R5 Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transformer TB1 Terminal Block Control Box TB2 Terminal Board 24...

Страница 24: ...Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S1 Control Switch S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transformer TB1 Terminal Block Control Box TB2 Terminal...

Страница 25: ...R5 Relay Hot Water Valve R6 Relay Control R7 Relay Night Setback NSB S1 Control Switch S2 Fan Speed Switch S3 Fan Cycle Switch S4 Damper Switch T1 Transformer TB1 Terminal Block Control Box TB2 Termin...

Страница 26: ...oil lightly to enhance dust collecting ability The Type K is also available with a carbon filter a zeolite filter or electrostatic filter The electrostatic filter is renewable by rinsing with hot wate...

Страница 27: ...fective part can then be returned to McQuay International or one of its authorized service stations So long as it is still in warranty it is repaired or replaced and returned to the owner without cost...

Страница 28: ...a short interval 4 Blowers run on Cool and compressor starts and runs but compressor occasionally stops on overload device 5 Compressor starts and runs on Cool but blowers do not run 6 Compressor star...

Страница 29: ...a short circuit or a grounded condition in the circuit c Replace d Replace wire or tighten e Adjust rotate knob to Warm f Replace g Replace h 1 Temporarily lock valve open replace 2 Replace 8 Insuffic...

Страница 30: ...Control Size 007 65 lbs Size 009 65 lbs Size 012 65 lbs Size 019 77 lbs Electric Heat Section With Control Size 007 60 lbs Size 009 60 lbs Size 012 60 lbs Size 019 70 lbs Wall Box With Rear Extension...

Страница 31: ...IM 1068 Page 31 of 32...

Страница 32: ...ranty details Refer to Form 933 43285Y To find your local McQuay Representative go to www mcquay com This document contains the most current product information as of this printing For the most up to...

Отзывы: