Operation and Maintenance

Blowing-Out Coils

1

Isolate the coil from the rest of the system by closing the 
valves on both the supply and return lines (see gate valves 
in Figure 5 and Figure 6).

2

Drain the coil by opening all drain valves and/or the drain 
plug. Remove the vent plug to aid the draining process.

3

Once the coil has been fully drained, the blower 
compressed air can be hooked-up. Caps installed in the 
piping on straight runs going to the supply and return 
connections are ideal points to hook-up the blower. The air 
vent and drain plug are not suitable locations for hooking 
up the blower. 

4

Close the vent or drain plug on the header that the blower is 
connected and open the drain valve or cap on the other 
header.

5

Operate the blower for 45 minutes and then check the coil 
to see if it is dry. A mirror placed in the discharge will 
become fogged if moisture is present. Repeat this 
procedure until the coil is dry.

6

Let the coil stand for several minutes then blow it out 
again. If water comes out, repeat the blowout operation.

7

Leave all plugs out and drains open until the threat of 
freezing has passed.

Figure 6: Horizontal Air Flow

Figure 7: Vertical Air Flow

Freeze Protection Fittings

During the winter, chilled water coils need to be protected 
against freezing. Factory installed and tested freeze protection 
fittings are brazed onto water and steam coil headers, return 
bends and tube stubs (as necessary) as part of the factory 
assembly process. Freeze relief caps are then screwed onto 
each fitting. All coils are leak tested at 315 psi air pressure 
before shipping. The relief caps are designed to burst at 650 
psig, relieving pressure before coil damage occurs. When 
freeze damage occurs, simply unscrew the ruptured relief caps 
and screw in replacement caps.

Figure 8: Freeze Protection Fittings

DANGER

The blower operator must take precautions to insure that water 
does not come into contact with any of the electrical 
components of the blower. Failure to do so will result in damage 
to the equipment and serious injury.

Supply

Gate

Valve

Return

Side Vent

Plug

Air Vent

Side Drain Plug

Air Flow

Union

Drain Valve

Cap

Dirt Leg

Tee

Содержание E-F5

Страница 1: ...2008 McQuay International Types HI F5 E F5 Installation and Maintenance Manual IM 900 McQuay Water Cooling Heating and High Capacity Booster Coils Group Applied Air Part Number IM 900 Date February 2008 ...

Страница 2: ...n 3 Receiving Instructions 3 Coil Types 3 Standard Fluid Coils 3 Nomenclature 3 Installation 4 Mounting 4 Installation 4 Operation and Maintenance 5 Operation 5 Initial Start Up 5 General 5 Maintenance 5 General 5 Blowing Out Coils 6 Freeze Protection Fittings 6 Flushing Coils 7 ...

Страница 3: ...uay sales representative Coil Types Standard Fluid Coils McQuay fluid coils are specifically designed for your particular application Flexibility is built into our manufacturing processes offering variations in fin type fin density circuitry arrangement coil casing and materials of construction Standard fluid type W coils utilize a collection header for one and two row applications and return bend...

Страница 4: ...ype W Standard Water M Splayed Headers B Booster Circuiting Q 1 4 serp M 1 1 2 serp H 1 2 serp D 2 serp L 3 4 serp S 1 serp B 3 tube center Booster S 1 circuit D 2 circuits B 3 tube centers Finned Length inches Finned Heigth inches Fin Design A flat AI Cu B E F5 AI Cu C HI F5 AI Cu Rows Deep Fins Per Inch ...

Страница 5: ...ble gas The coil should be left pressurized for a minimum of 10 minutes If the coil holds the pressure the hook up can be considered leak free If the pressure drops by 5 psig or less re pressurize the coil and wait another 10 minutes If the pressure drops again there is more than likely one or more small leaks which should be located and repaired Pressure losses greater than 5 psig would indicate ...

Страница 6: ...commended cleaning solution For more information contact your local McQuay Parts Distributor c Determine required dilution for the specific application It is recommended to start with a dilution ratio of 10 1 and increase concentration until the desired results are achieved d As with mixing all acids place the desired amount of water into the tank and then add the chemicals e Turn off fans and all...

Страница 7: ...nutes then blow it out again If water comes out repeat the blowout operation 7 Leave all plugs out and drains open until the threat of freezing has passed Figure 6 Horizontal Air Flow Figure 7 Vertical Air Flow Freeze Protection Fittings During the winter chilled water coils need to be protected against freezing Factory installed and tested freeze protection fittings are brazed onto water and stea...

Страница 8: ...he system by closing the valves on both the supply and return lines gate valves in Figure 5 and Figure 6 4 Drain the coil by opening all drain valves and or the drain plug Remove the vent plug to aid the draining process 5 Close the drain valve s and drain plug 6 Connect the flushing system to the coil A typical system is shown in Figure 9 7 With the throttling valve closed start the pump and oper...

Страница 9: ......

Страница 10: ...n training or call 540 248 9646 and ask for the Training Department Warranty All McQuay equipment is sold pursuant to its standard terms and conditions of sale including Limited Product Warranty Consult your local McQuay Representative for warranty details Refer to Form 933 43285Y To find your local McQuay Representative go to www mcquay com This document contains the most current product informat...

Отзывы: