background image

6

McQuay IM 900

Operation and Maintenance

Operation and Maintenance

Operation

Initial Start-Up

1

Open all air vents to eliminate air in the coil circuitry and 
headers.

2

Verify that all vents and drains are unobstructed and can 
discharge a stream of water.

3

Fill the coil with water an then close all vents.

4

Perform an initial hydrostatic leak test of all brazed, 
threaded or flanged joints, valves, and interconnecting 
piping. Recheck the coil level and correct if necessary. 
When the setup is found to be leak free, discharge and 
discard initial water charge. It is important that all grease, 
oil, flux and sealing compounds found present during 
installation be removed.

General

1

Proper air distribution is vital to coil performance. Airflow 
anywhere on the coil face should not vary by more than 
20%.

2

The drain pan and associated piping (drain line and trap) 
should be installed so that there is no standing water in the 
drain pan and that no blow-through occurs.

3

Working pressure rating is 250 psig @ 300°F (standard)

4

Fluid and air velocities should be maintained within 
McQuay’s recommended values and for ARI certification.

Table 1: Fluid Velocities

Maintenance

General

1

Filters should be inspected on a regular basis and changed 
as needed. Maintaining clean filters is a cost effective way 
to help maintain maximum coil performance and service 
life.

2

Periodic inspection of the coil for signs of corrosion and/or 
leaks is recommended. Repair and replacement of the coil 

and the connecting piping, valves, etc., should be 
performed as needed by a qualified individual.

3

Should the coil surface need cleaning, caution should be 
exercised in selecting the cleaning solution as well as the 
cleaning equipment. Improper selection can result in 
damage to the coil and/or health hazards.

4

Suggested cleaning instructions:

a

When handling strong chemicals, be sure to wear 
chemical impervious gloves, apron and splash goggles.

b

Acti-Brite (AB-1) is the recommended cleaning 
solution. For more information, contact your local 
McQuay Parts Distributor.

c

Determine required dilution for the specific application. 
It is recommended to start with a dilution ratio of 10:1 
and increase concentration until the desired results are 
achieved.

d

As with mixing all acids, place the desired amount of 
water into the tank and then add the chemicals.

e

Turn off fans and allow hot coils to cool before 
applying.

f

Using plain water, wet both the coil as well as the area 
surrounding the equipment. Wetting the coil with water 
aids in product penetration and performance.

g

Apply properly diluted product to coil surface. 
Whenever possible, apply solution from the outlet side 
of the coil. Allow solution to remain on surface, 
normally 5-10 minutes. Do not allow solution to dry on 
the coil. 

Note: 

In extreme cases, application may have to be 

repeated to achieve desired results.

h

If foaming does not occur, check for extreme grease 
buildup which will slow the cleaning process. Foaming 
may not occur if coil is coated or painted.

i

Rinse coils, tools, and surrounding area thoroughly after 
the coil cleaning.

5

Clean the coil from the leaving airside so that foreign 
material will be washed out of the coil rather than pushed 
further in. 

6

Maintain the circulated fluid free of sediment, corrosive 
products, and biological contaminants. Periodic testing of 
the fluid followed by any necessary corrective measures, 
along with maintaining adequate fluid velocities and proper 
filtering of the fluid, will help to satisfy this goal.

7

If automatic air vents are not utilized, periodic venting of 
the coil is recommended to remove accumulated air. 

Fluid Velocity

Water

1 to 8 fps

Glycol

1 to 6 fps

DANGER

Follow the manufacturer’s guidelines for lockout/tagout and 
disconnect all power to the unit before performing maintenance. 
Contact with high voltage power will cause electrical shock, 
resulting in severe personal injury or death.

WARNING

Moving parts, high pressure, and/or high temperature fluids can 
cause serious personal injury.

CAUTION

Carefully read and follow the manufacturer's recommendations 
before using any cleaning fluid.

Содержание E-F5

Страница 1: ...2008 McQuay International Types HI F5 E F5 Installation and Maintenance Manual IM 900 McQuay Water Cooling Heating and High Capacity Booster Coils Group Applied Air Part Number IM 900 Date February 2008 ...

Страница 2: ...n 3 Receiving Instructions 3 Coil Types 3 Standard Fluid Coils 3 Nomenclature 3 Installation 4 Mounting 4 Installation 4 Operation and Maintenance 5 Operation 5 Initial Start Up 5 General 5 Maintenance 5 General 5 Blowing Out Coils 6 Freeze Protection Fittings 6 Flushing Coils 7 ...

Страница 3: ...uay sales representative Coil Types Standard Fluid Coils McQuay fluid coils are specifically designed for your particular application Flexibility is built into our manufacturing processes offering variations in fin type fin density circuitry arrangement coil casing and materials of construction Standard fluid type W coils utilize a collection header for one and two row applications and return bend...

Страница 4: ...ype W Standard Water M Splayed Headers B Booster Circuiting Q 1 4 serp M 1 1 2 serp H 1 2 serp D 2 serp L 3 4 serp S 1 serp B 3 tube center Booster S 1 circuit D 2 circuits B 3 tube centers Finned Length inches Finned Heigth inches Fin Design A flat AI Cu B E F5 AI Cu C HI F5 AI Cu Rows Deep Fins Per Inch ...

Страница 5: ...ble gas The coil should be left pressurized for a minimum of 10 minutes If the coil holds the pressure the hook up can be considered leak free If the pressure drops by 5 psig or less re pressurize the coil and wait another 10 minutes If the pressure drops again there is more than likely one or more small leaks which should be located and repaired Pressure losses greater than 5 psig would indicate ...

Страница 6: ...commended cleaning solution For more information contact your local McQuay Parts Distributor c Determine required dilution for the specific application It is recommended to start with a dilution ratio of 10 1 and increase concentration until the desired results are achieved d As with mixing all acids place the desired amount of water into the tank and then add the chemicals e Turn off fans and all...

Страница 7: ...nutes then blow it out again If water comes out repeat the blowout operation 7 Leave all plugs out and drains open until the threat of freezing has passed Figure 6 Horizontal Air Flow Figure 7 Vertical Air Flow Freeze Protection Fittings During the winter chilled water coils need to be protected against freezing Factory installed and tested freeze protection fittings are brazed onto water and stea...

Страница 8: ...he system by closing the valves on both the supply and return lines gate valves in Figure 5 and Figure 6 4 Drain the coil by opening all drain valves and or the drain plug Remove the vent plug to aid the draining process 5 Close the drain valve s and drain plug 6 Connect the flushing system to the coil A typical system is shown in Figure 9 7 With the throttling valve closed start the pump and oper...

Страница 9: ......

Страница 10: ...n training or call 540 248 9646 and ask for the Training Department Warranty All McQuay equipment is sold pursuant to its standard terms and conditions of sale including Limited Product Warranty Consult your local McQuay Representative for warranty details Refer to Form 933 43285Y To find your local McQuay Representative go to www mcquay com This document contains the most current product informat...

Отзывы: