Installation

Installation

Mounting

All McQuay water and glycol coils are designed to be fully 
drainable when properly mounted. Vertical air-flow is not 
recommended for dehumidifying coils.

Figure 2: Coil Mounts

Installation

If you are unsure about any portion of the installation, contact 
your local steam specialist for assistance

.

1

Carefully remove the coil from the shipping package to 
avoid damage to the finned surface area. Damaged fins can 
be straightened using an appropriate fin comb. 

2

McQuay recommends cleaning the coil with a 
commercially available coil cleaner prior to installation. 
Refer to “Maintenance” on page 5 for cleaning 
recommendations.

3

Check the coil hand designation to insure that it matches 
the system. Water and glycol coils are generally plumbed 
with the supply connection located on the bottom of the 
leaving air-side of the coil and the return connection at the 
top of the entering air-side of the coil. This arrangement 
(Figure 2) provides counter flow heat exchange and 
positive coil drainage. If a universal coil is supplied, cap off 
the two unused connections.

Figure 3: Supply and Return Locations

4

Standard coils must be mounted level to insure proper 
drainage. Refer to “Mounting” on page 4 for leveling 
requirements. 

5

Proper clearance should be maintained between the coil 
and other structures such as the fan, filter racks, transition 
areas, etc.

6

Once installed, the coil should be pressurized to 100 psig 
with dry nitrogen or other suitable gas. The coil should be 
left pressurized for a minimum of 10 minutes. If the coil 
holds the pressure, the hook-up can be considered leak free. 
If the pressure drops by 5 psig or less, re-pressurize the coil 
and wait another 10 minutes. If the pressure drops again, 
there is more than likely one or more small leaks which 
should be located and repaired. Pressure losses greater than 
5 psig would indicate a larger leak that should be isolated 
and repaired. If the coil itself is found to be leaking, contact 
your local McQuay sales representative.

Note: 

Unauthorized repair to the coil may void the coil's 

warranty (see McQuay’s warranty policy on back 
cover).

7

All field brazing and welding should be performed using 
high quality materials and an inert gas purge (like nitrogen) 
to reduce oxidation of the internal surface of the coil.

8

All field piping must be self-supporting. System piping 
should be flexible enough to allow for thermal expansion 
and contraction of the coil. Typical piping diagrams are 
represented in Figure 4 and Figure 5.

Figure 4: Horizontal Air Flow

Figure 5: Vertical Air Flow

CAUTION

Sharp edges on sheet metal and fasteners can cause 
personal injury. 

This equipment must be installed, operated, 

and serviced only by an experienced installation company and 
fully trained personnel.
Protective equipment such as safety glasses, steel toe boots 
and gloves are recommended during the installation and 
routine maintenance of the coil.

CAUTION

Failure to properly install the coil can result in irreparable 
damage to the coil as well as other components in the system.

Supply

Gate

Valve

Return

Side Vent

Plug

Air Vent

Side Drain Plug

Air Flow

Union

Drain Valve

Cap

Dirt Leg

Tee

Содержание E-F5

Страница 1: ...2008 McQuay International Types HI F5 E F5 Installation and Maintenance Manual IM 900 McQuay Water Cooling Heating and High Capacity Booster Coils Group Applied Air Part Number IM 900 Date February 2008 ...

Страница 2: ...n 3 Receiving Instructions 3 Coil Types 3 Standard Fluid Coils 3 Nomenclature 3 Installation 4 Mounting 4 Installation 4 Operation and Maintenance 5 Operation 5 Initial Start Up 5 General 5 Maintenance 5 General 5 Blowing Out Coils 6 Freeze Protection Fittings 6 Flushing Coils 7 ...

Страница 3: ...uay sales representative Coil Types Standard Fluid Coils McQuay fluid coils are specifically designed for your particular application Flexibility is built into our manufacturing processes offering variations in fin type fin density circuitry arrangement coil casing and materials of construction Standard fluid type W coils utilize a collection header for one and two row applications and return bend...

Страница 4: ...ype W Standard Water M Splayed Headers B Booster Circuiting Q 1 4 serp M 1 1 2 serp H 1 2 serp D 2 serp L 3 4 serp S 1 serp B 3 tube center Booster S 1 circuit D 2 circuits B 3 tube centers Finned Length inches Finned Heigth inches Fin Design A flat AI Cu B E F5 AI Cu C HI F5 AI Cu Rows Deep Fins Per Inch ...

Страница 5: ...ble gas The coil should be left pressurized for a minimum of 10 minutes If the coil holds the pressure the hook up can be considered leak free If the pressure drops by 5 psig or less re pressurize the coil and wait another 10 minutes If the pressure drops again there is more than likely one or more small leaks which should be located and repaired Pressure losses greater than 5 psig would indicate ...

Страница 6: ...commended cleaning solution For more information contact your local McQuay Parts Distributor c Determine required dilution for the specific application It is recommended to start with a dilution ratio of 10 1 and increase concentration until the desired results are achieved d As with mixing all acids place the desired amount of water into the tank and then add the chemicals e Turn off fans and all...

Страница 7: ...nutes then blow it out again If water comes out repeat the blowout operation 7 Leave all plugs out and drains open until the threat of freezing has passed Figure 6 Horizontal Air Flow Figure 7 Vertical Air Flow Freeze Protection Fittings During the winter chilled water coils need to be protected against freezing Factory installed and tested freeze protection fittings are brazed onto water and stea...

Страница 8: ...he system by closing the valves on both the supply and return lines gate valves in Figure 5 and Figure 6 4 Drain the coil by opening all drain valves and or the drain plug Remove the vent plug to aid the draining process 5 Close the drain valve s and drain plug 6 Connect the flushing system to the coil A typical system is shown in Figure 9 7 With the throttling valve closed start the pump and oper...

Страница 9: ......

Страница 10: ...n training or call 540 248 9646 and ask for the Training Department Warranty All McQuay equipment is sold pursuant to its standard terms and conditions of sale including Limited Product Warranty Consult your local McQuay Representative for warranty details Refer to Form 933 43285Y To find your local McQuay Representative go to www mcquay com This document contains the most current product informat...

Отзывы: