background image

15

In the event it is necessary to repack the equipment for 

shipment, the equipment must be packed exactly as 

shown below. Failure to do this will result in shipping 

damage.

Use the original shipping carton and interior parts 

only if they are all in good serviceable condition. If 

a shipping carton or any of the interior part(s) are 

needed, please call or write Customer Service Depart-

ment of McIntosh Laboratory. Refer to page 4. Please 

see the Part List for the correct part numbers.

Packing Instructions

Quantity  Part Number  Description

034496 

Shipping Carton Complete

Packing Instructions

Содержание MCLK12

Страница 1: ...McIntosh Laboratory Inc 2 Chambers Street Binghamton New York 13903 2699 Phone 607 723 3512 www mcintoshlabs com MCLK12 Analog Clock Owner s Manual...

Страница 2: ...d for your safety If the provided plug does not fit into your outlet consult an electrician for replacement of the obsolete outlet 10 Protect the power cord from being walked on or pinched particularl...

Страница 3: ...of having to reset the cor rect time when AC Power is restored The MCLK12 may be supplied with a battery depending on the country where the MCLK12 is purchased When pur chasing a battery for use in t...

Страница 4: ...in need of repair you can return it to your Dealer You can also return it to the McIntosh Laboratory Service Department For assistance on factory repair return procedure contact the McIntosh Service D...

Страница 5: ...s and Hour Meters on the MCLK12 display the current time and are illuminated with extra long life Light Emitting Diodes LEDs Power Control The Power Control Input and Output connections provides conve...

Страница 6: ...ing the best location for your MCLK12 BACKUP BATTERY Front View of the MCLK12 Rear View of the MCLK12 Side View of the MCLK12 17 1 2 44 45cm 8 7 8 22 54cm 16 15 16 43 02cm 7 5 32 18 18cm 7 5 32 18 18c...

Страница 7: ...es electronic cables or any heating cooling duct work located in the wall behind where the clock will be mounted 4 Using a drill equipped with a 3 8 inch 9 5 mm drill bit drill two holes into the dryw...

Страница 8: ...efer to information on the back panel of your MCLK12 to determine the correct volt age for your unit POWER CONTROL INput receives a turn on signal from a Preamplifier or A V Control Center Removable c...

Страница 9: ...ystem may vary from this however the actual components would be connected in a similar manner For additional information refer to Connector and Cable Information on page 5 Power Control Connections 1...

Страница 10: ...ours and Minutes Meter indicates the current Hour Front Panel Displays and Controls Meter indicates the current Minute METER LIGHTS switches On Off illumination of the Meters Hours and Minutes also sw...

Страница 11: ...rrent time Front Panel Illumination When the MCLK12 is connected to a McIntosh Pre amplifier A V Control Center Integrated Amplifier or A V Receiver via the Power Control Connection the Front Panel Il...

Страница 12: ...12...

Страница 13: ...13 Photos...

Страница 14: ...ower Requirements 100V 50 60Hz at 2 0 Watts 110V 50 60Hz at 2 0 Watts 120V 50 60Hz at 2 0 Watts 220V 50 60Hz at 2 0 Watts 230V 50 60Hz at 2 0 Watts 240V 50 60Hz at 2 0 Watts Note Refer to the rear pan...

Страница 15: ...ng carton and interior parts only if they are all in good serviceable condition If a shipping carton or any of the interior part s are needed please call or write Customer Service Depart ment of McInt...

Страница 16: ...cts is the policy of McIntosh Laboratory Incorporated who reserve the right to improve design without notice Printed in the U S A McIntosh Laboratory Inc 2 Chambers Street Binghamton NY 13903 www mcin...

Отзывы: