Operation
3 - 4
Inserting Heater
The heater is not explosion proof. Operation
of heater in an explosive atmosphere without
necessary safety precautions will result in serious
injury or death.
If operating in an explosive atmosphere, heater should be brought
up to temperature in a safe environment, then unplugged before
entering the explosive atmosphere for fusion.
Use a clean non-synthetic cloth to clean the butt fusion heater
adapter surfaces.
Verify heater temperature by noting the reading on the dial
thermometer.
Insert heater between the pipe ends. The stripper bar downward
legs should be outside of the jaws. (not on top)
TX04050-03-24-14
PH
04
271-
7-
20
-10
¡PELIGRO!
Heating the Pipe
With heater in position between the pipe ends, snap pipe ends
sharply against the heater to ensure alignment. Follow the pipe
manufacturer's recommendations for heating time and pressure.
Raise the locking cam into the engaged position while in the
heating cycle.
TX00842-1-8-96
PH
04
27
2-
7-
20
-10
Fusing the Pipe
After the heating cycle is completed, remove the heater and
quickly apply fusion force with the lever handle in accordance
with the pipe manufacturer's recommended fusion procedure or
appropriate joining standard. A torque wrench can be used when
a specified Interfacial Pressure is required. Hold this force for at
least 10 seconds.
After 10 seconds, the locking cams will assist by maintaining jaw
position during the cooling cycle.
NOTICE:
Failure to follow pipe manufacturer's heating time,
pressure and cooling time may result in a bad joint.
TX04693-06-23-16
PH
04
27
3-
7-
20
-10
Содержание Pit Bull 26
Страница 1: ...Manual 711501 Revision F 10 18 Pit Bull 26 Fusion Machine Operator s Manual Original Language English...
Страница 30: ......
Страница 32: ......