Butt Fusion Procedure
3 - 9
Position Machine for Next Joint
Move the fusion machine into position for the next fusion joint.
TX02985-5-4-09
Open Fixed Jaws
Open the fixed jaws.
TX00381-9-16-94
PH
04
30
6-
7-
23-10
PH
04
30
7-
7-
23-10
Install Next Piece of Pipe
Move the carriage control valve to the open position and actuate
the pump lever to open the carriage completely.
Insert a new piece of pipe in movable jaws and repeat all
previous procedures.
TX02966-4-15-09
PH
04
30
8-
7-
23-10