CartPark Architectural |
Page 5 of 11
5
Slide Top Cross Rail
Slide cross rail into the cut out openings of the Left Top
Rail, outs as shown. Rest opposite end of cross rails into
the top of the right verticals. Do not secure crossbar and
continue next step.
6
Cross Rail
Cross Rail
Cut out Opening
Rest
Right Top Rail
upright
Secure Toprails
1
2
3
4
Cross Rail
Cross Rail
Secure Toprails
Secure Cross Rail
Open end of
Cross rail
Slide Right Toprail into Cross Rails
and into the right vertical uprights.
1. Slide right Toprail into the open ends of the crossbars.
2. Once in place, lift Toprail up and over uprights so that
the cross rails come off the uprights.
3. Slide top rail over uprights and
4. Lower into the open ends of the uprights. Secure
Toprails to uprights with 16, ¼-20 x 1.0” Taptite screws
coated with wax. Secure Cross rails to Right and Left
Toprails with 16, Taptite ¼-20 x 1.0” screws.
Important:
Make sure every hole
attachment is secured by a screw.
A total of 32 screws are needed in
this step.