![MBO Delivery KAS 30ME Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/mbo/delivery-kas-30me/delivery-kas-30me_translation-of-the-original-operating-manual_1752714055.webp)
Delivery KAS 30ME MC-Control
51
Transport/Set-up/Start-up
Start-up
6.6
Start-up
6.6.1
Brief instructions
• Check the supply voltage
See Chapter “6.6.2 Checking the supply voltage”.
• Check the control cabinet cover.
See chapter “6.6.3 Checking the control cabinet cover”
• Check machine functions.
See chapter “6.6.4 Checking machine functions”
• Final check of the protective devices
See Chapter “6.7 Final check of the protective devices”.
• Inspection after initial start-up
See Chapter “6.8 Inspection after first start-up”.
6.6.2
Checking the supply voltage
Procedure:
First check that the correct supply voltage is present.
See Chapter “3.2.6 Supply”.
Only then plug the power plug into the preceding folding unit.
6.6.3
Checking the control cabinet cover
Check that the covers on all control cabinets are grounded and closed ac-
cording to regulations.
Procedure:
Check this by visual inspection.
6.6.4
Checking machine functions
Procedure:
Check the complete machine function by setting up a customer job/test
job.
Incorrect supply voltage.
Non-observance may cause severe property damage.
If the existing nominal voltage deviates from the details on the label, wiring
diagram, and "the "Technical data" in the operating manual, an isolating
transformer must be used.
You can get the necessary information from the manufacturer.
127,&(
Содержание Delivery KAS 30ME
Страница 1: ...Delivery Translation of the original operating manual Keep for future use KAS 30ME MC Control...
Страница 9: ...Delivery KAS 30ME MC Control 5 List of contents 10 2 Disposal recycling 88...
Страница 10: ...6 Delivery KAS 30ME MC Control List of contents...
Страница 50: ...46 Delivery KAS 30ME MC Control Operating and display elements operating modes Operating modes...