- 10 -
4. INSTALLATION INSTRUCTIONS
Installation and adjustment operations are to be carried out by qualified personnel according to the norms in force.
(See technical specification tables on page 4).
WARNINGS:
- If the oven is installed against a wall, the wall needs to withstand temperatures of 80°C and must be incombustible.
- Inlets (water and electricity) and outlets (waste water, steam etc.) are signalled by dedicated tags.
- The top of the oven is not to be used to store goods!
4.1 PREPARING FOR INSTALLATION
Before proceeding to installation, remove the protective plastic film and eliminate any adhesive residues by means of a
suitable product for cleaning stainless steel.
4.1.1 LAWS, REGULATIONS AND TECHNICAL DIRECTIVES
The following regulations must be observed during installation:
- Fire regulations.
- Current accident-prevention regulations.
- The regulations of the gas board.
- “Gas system installation” standards.
- “Electric system installation” standards.
- The regulations of the electricity board.
- The regulations of the water board.
- Local ”municipal” norms on the drainage of waste water.
- Health regulations.
- Italian law no.46 05/03/1990.
- Safety standards UNI-CIG 8723 and Italian Ministerial Decree D.M. no. 74 dated 12/04/96.
4.1.2 PLATE TO E.U. STANDARDS
TO STANDARDS EN 437 and EN 203 Part 1
ADHESIVE PLATES
GAS FITTING
G 20
20 mbar
G 30/31 29/37 mbar
Содержание FGMD107
Страница 7: ...7 3 2 DIRECT COMBINED GAS OVEN FGMD67 FGMD67SC WITH STAND SF3...
Страница 22: ...22...