background image

37

GAS INFORMATION

GAS PIPE CAPACITIES

Nominal Pipe

Diameter (IN.)

Length of Pipe Run (Feet)

10

20

30

40

50

60

70

80

1/2

130

90

75

65

55

50

45

40

3/4

280

190

150

130

115

105

95

90

1

520

350

285

245

215

195

180

170

1 1/4

1,050

730

590

500

440

400

370

350

1 1/2

1,600

1,100

890

760

670

610

NOTE: 

The cubic feet per hour listed in the table above must be greater than the cubic feet per hour of gas fl ow required by 

the furnace. To determine the cubic feet per hour of gas fl ow required by the furnace, divide the input rate of the furnace by 
the heating value (from gas supplier) of the gas. 

Cubic Feet Per Hour Required =

Input To Furnace (Btu/hr)

Heating Value of Gas (Btu/Cu. Ft.)

Table 12. Capacity of Black Iron Gas Pipe (cu. ft. per hour)

for Natural Gas w/ Specifi c Gravity = 0.60

GAS FLOW RATES

TIME FOR

ONE REVOLUTION

(SECONDS)

CUBIC FEET PER

REVOLUTION OF GAS METER

1

5

10

10

360

1,800

3,600

12

300

1,500

3,000

14

257

1,286

2,571

16

225

1,125

2,250

18

200

1,000

2,000

20

180

900

1,800

22

164

818

1,636

24

150

750

1,500

26

138

692

1,385

28

129

643

1,286

30

120

600

1,200

32

113

563

1,125

34

106

529

1,059

36

100

500

1,000

38

95

474

947

40

90

450

900

42

86

429

857

44

82

409

818

46

78

391

783

48

75

375

750

50

72

360

720

52

69

346

692

54

67

333

667

56

64

321

643

58

62

310

621

60

60

300

600

62

58

290

581

64

56

281

563

Table 11. Gas Flow Rates (Cubic Feet per Hour)

GAS FLOW RATES

TIME FOR

ONE REVOLUTION

(SECONDS)

CUBIC FEET PER

REVOLUTION OF GAS METER

1

5

10

66

55

273

545

68

53

265

529

70

51

257

514

72

50

250

500

74

49

243

486

76

47

237

474

78

46

231

462

80

45

225

450

82

44

220

439

84

43

214

429

86

42

209

419

88

41

205

409

90

40

200

400

92

39

196

391

94

38

191

383

96

38

188

375

98

37

184

367

100

36

180

360

102

35

176

353

104

35

173

346

106

34

170

340

108

33

167

333

110

33

164

327

112

32

161

321

114

32

158

316

116

31

155

310

118

31

153

305

120

30

150

300

Содержание *TC

Страница 1: ...llow the gas supplier s instructions If you cannot reach your gas supplier call the fire department WARNING RISQUE D INCENDIE OU D EXPLOSION Le non respect des avertissements de s curit pourrait entra...

Страница 2: ...R REQUIREMENTS 14 Plenums Air Ducts 14 Supply Air Connections 15 Upflow Horizontal Furnaces 15 Downflow Furnaces 15 Return Air Connections 15 Upflow Horizontal Furnaces 15 Side Return Installations 15...

Страница 3: ...l Cooling Heat Pump CFM Variable Speed 36 Gas Information 37 Table 11 Gas Flow Rates 37 Table 12 Gas Pipe Capacities 37 Table 13 High Altitude Deration Chart for Propane Gas 38 Table 14 Natural Gas He...

Страница 4: ...may be used for temporary heating of buildings or structures under construction See the guidelines listed on pages 5 This furnace is not approved for installation in mobile homes Installing this furn...

Страница 5: ...uous return temperature must not be below 60 F 15 C Occasionally a temporary return temperature of 55 F 12 C is acceptable However operation with a return temperature below 55 F 12 C is not allowed He...

Страница 6: ...hes Back 0 Inches Allow 24 in minimum clearance for servicing Recommended clearance is 36 in TOP FRONT UPFLOW APPLICATIONS HORIZONTAL APPLICATIONS VENT TOP FRONT DOWNFLOW APPLICATIONS SIDE TOP BOTTOM...

Страница 7: ...rit ci dessus rouvrir les portes et les fen tres et remettre les ventilateurs d vacuation les registres de foyers et tout autre appareil fonctionnant au gaz leur tat de fonctionnement initial CARBON M...

Страница 8: ...icted If the furnace is operated without adequate air for combustion the flame roll out switch will open turning off the gas supply to the burners NOTE This safety device is a manually reset switch DO...

Страница 9: ...freely exchange with the outdoors Figure 2 Outdoor Air Using Vertical Ducts If combustion air is taken from outdoors through vertical ducts the openings and ducts must have a minimum free area of one...

Страница 10: ...G Upon completion of the furnace installation carefully inspect the entire flue system both inside and outside the furnace to assure it is properly sealed Leaks in the flue system can result in seriou...

Страница 11: ...aterial Vent and combustion air pipe and fittings must be one of the following materials in the list and must conform to the indicated ANSI ASTM standards Cement must conform to ASTM Standard D2564 fo...

Страница 12: ...install a coupling 1 Slide the rubber coupling over the end of the pipe that is attached to the furnace and secure it with one of the hose clamps 2 Slide the other end of the rubber coupling onto the...

Страница 13: ...gths noted in Table 2 page 11 For Canadian installations please refer to the Canadian Installation Code CAN CGA B149 1 or 2 and or local codes For extremely cold climates or for conditions of short fu...

Страница 14: ...QUIREMENTS WARNING Do not allow combustion products to enter the circulating air supply Failure to prevent the circulation of combustion products into the living space can create potentially hazardous...

Страница 15: ...rn air NOTE Do not use the back of the furnace for return air Side Return Installations To attach the return air duct to the left or right side of the furnace punchoutthefourknockouts Figure29 fromthe...

Страница 16: ...ecifications Upflow Installation WARNING The furnace must not be installed directly on carpeting tile oranycombustiblematerialother than wood flooring Side Return Air Inlet TCseriesgasfurnacesareshipp...

Страница 17: ...inducer assembly 2 See Figure 14 page 18 2 Remove the inducer assembly ground wire 3 from the blower deck 4 or door 3 Removefourscrews 5 securingtheinducerassembly 2 to the header box 6 4 Remove drain...

Страница 18: ...have two pairs of switches One set is connected to the static tap on the inducer assembly and the other to the collector box Downflow TL furnaces require only one pair of switches to be connected to...

Страница 19: ...r grommet should be installed in the 1 5 8 hole prior to running the gas pipe into the cabinet No sealants are required The 3 4 rubber grommet is used if venting out the left side of the cabinet and t...

Страница 20: ...eral rules In some cases the lowest point in the vent system is where it connects to the inducer Options 6 8 In this case one drain at this location is sufficient If the vent exits the furnace horizon...

Страница 21: ...comply with the latest edition of the National Fuel Gas Code ANSI Z223 1 or CAN CGA B149 1 or 2 Installation Codes IMPORTANT NOTES Some local regulations require the installation of a manual main shu...

Страница 22: ...des fuites de gaz Pour la v rification de tous les joints utiliser plut t une solution savonneusecommercialefabriqu esp cifiquement pur la d tection des fuites de gaz Un incendie ou une explosion peut...

Страница 23: ...Shut Off Valve to be 4 to 5 feet above floor NOTE B Inducer assembly omitted for clarity of pipe installation Figure 22 Typical Gas Connections 6 4 2 UPFLOW MODELS DOWNFLOW MODELS 1 See Note B See Not...

Страница 24: ...to LP Propane gas must be performed by qualified service personnel using a factory supplied conversion kit Failure to use the properconversionkitcancausefire explosion propertydamage carbonmonoxidepo...

Страница 25: ...be controleed by a 24 VAC thermostat The thermostat s wiring must comply with the current provisions of the NEC ANSI NFPA 70 and with applicable local codes having jurisdiction NORDYNE no longer supp...

Страница 26: ...it s Y C terminals Single Stage AC Two Stage Thermostat This option uses the full two stage heating capability of the furnace with a single stage outdoor unit See Figure 22 Connect the thermostat s W1...

Страница 27: ...7 2 If using a separate humidistat connect the DHUM R terminals on the humidistat to the DHUM R terminals on the motor control board In this option the DHUM output of the humidistat must be set to be...

Страница 28: ...s until all of the checks in the previous steps have been completed 1 Set the thermostat to the lowest setting 2 Turn off all electrical power to the furnace 3 Follow the Operating Instructions on the...

Страница 29: ...lowers should continue to run when the limit switch opens 1 Check the blower door for secure mounting and that there is power to the furnace 2 Block the return airflow to the furnace by installing a c...

Страница 30: ...tinues to run the fan for a period of 60 seconds Fan Mode When the thermostat energizes the G terminal for continuous fan without calling for heat or cooling the indoor fan is energized on the selecte...

Страница 31: ...gas control switch to the OFF position 5 Disconnect the wires from the gas valve igniter flame sensor and flame rollout switch CAUTION To prevent damage to the unit or internal components it is recomm...

Страница 32: ...alified service technician to identify and repair the problem If the furnace still doesn t operate check the Flame Roll out Switches Figure 41 and reset if necessary If the furnace operates when the F...

Страница 33: ...s 1 5 8 T stat 7 8 18 1 2 Front Brace LEFT SIDE RIGHT SIDE Electric 7 8 25 1 2 22 1 2 Gas 1 5 8 Vent pipe 3 Cond 1 1 16 B 19 FLANGES TOP VIEW 3 7 1 2 Flue C BOTTOM VIEW Electric 7 8 Vent pipe 3 Cond 1...

Страница 34: ...5 0 0 1 0 1 525 58 1 450 61 1 375 64 1 300 68 1 225 72 1 150 76 1 075 82 1 000 88 1 0 1 0 1 620 54 1 540 57 1 465 60 1 390 63 1 315 67 1 240 71 1 165 76 1 090 81 0 1 1 0 1 695 52 1 620 54 1 545 57 1 4...

Страница 35: ...345 52 1 345 65 1 0 0 1 460 48 1 460 60 1 0 1 1 575 45 1 575 56 1 1 0 1 690 42 1 690 52 1 1 1 1 805 39 1 805 49 D CABINET Switch Settings for Heat 0 OFF 1 ON TC TL 120D VD Input BTU 120 000 1 2 3 4 CF...

Страница 36: ...7 8 LOW HIGH 0 0 0 0 705 1 025 2 5 TON 0 0 0 1 750 1 090 3 TON 0 0 1 0 795 1 155 0 0 1 1 840 1 220 0 1 0 0 885 1 285 3 5 TON 0 1 0 1 930 1 350 0 1 1 0 975 1 415 4 TON 0 1 1 1 1 020 1 480 1 0 0 0 1 065...

Страница 37: ...ER REVOLUTION OF GAS METER 1 5 10 10 360 1 800 3 600 12 300 1 500 3 000 14 257 1 286 2 571 16 225 1 125 2 250 18 200 1 000 2 000 20 180 900 1 800 22 164 818 1 636 24 150 750 1 500 26 138 692 1 385 28...

Страница 38: ...56 56 56 56 ORIFICE SIZE 4 2 9 0 4 2 9 0 4 2 9 0 4 2 9 0 MANIFOLD PRESSURE 8 000 to 10 000 FT 56 56 56 56 ORIFICE SIZE 4 2 8 5 4 2 8 5 4 2 8 5 4 2 8 5 MANIFOLD PRESSURE LOCAL HEATING VALUES FOR NATUR...

Страница 39: ...PRESSURE 9 000 to 9 999 FT 48 48 48 48 ORIFICE SIZE 1 7 2 8 1 7 2 8 1 7 2 8 1 7 2 8 MANIFOLD PRESSURE Table 16 High Altitude Deration Chart for Natural Gas Low heating Value NATURAL GAS with LOW HEAT...

Страница 40: ..._IN H_OUT L2 OUT L2 IN L1 IN L1 OUT Y1_OUT Y Y2_OUT W_OUT C EXPANSION PORT R RED GREEN NOT FOR FIELD USE CONNECTION TO FURNACE CONTROL BOARD CONNECTION TO IQ THERMOSTAT IF APPLICABLE MOTOR WIRING HARN...

Страница 41: ...REEN BROWN BROWN YELLOW VIOLET VIOLET VIOLET ORANGE ORANGE ORANGE VENT LIMIT ON SELECT MODELS BLACK 120V WHITE NEUTRAL GROUND 710916 CONDENSATE ON SELECT MODELS Refer to the Installation Instructions...

Страница 42: ...END 0409 LOW VOLTAGE HIGH VOLTAGE BLUE BLUE BLUE BLUE BLACK BLACK 120V WHITE BLACK BLACK BLACK BLACK BLACK BLACK WHITE WHITE NEUTRAL BLACK WHITE WHITE RED RED GREEN GROUND GREEN BROWN BROWN YELLOW VIO...

Страница 43: ...AL GROUND CONDENSATE ON SELECT MODELS BLACK VIOLET For 80 and 90 2 Stage Variable Speed Upflow Furnaces WIRING DIAGRAM 7109180 FIELD WIRING LEGEND LOW VOLTAGE HIGH VOLTAGE Refer to the Installation In...

Страница 44: ...t Flash Off Low Flame Sensor Signal Flame Present Diagnostic Description FAULT CONDITIONS Diagnostic Description Yellow LED Continuous Flash On Alternating Flash Motor Fault On Off 0409 FLAME ROLL OUT...

Страница 45: ...ance 6 inches 15cm for appliances 10 000 Btuh 3kW 6 inches 15cm for appliances 10 000 Btuh 3kW 4 ft 1 2m below or to side of opening 1 ft 300mm above opening 12 inches 30cm for appliances 10 000 Btuh...

Страница 46: ...5 ft Intervals Upward Pitch 1 4 per foot Flue Pipe First support placed as close to furnace connection as possible Wall Normal Snow Level COMBUSTION AIR 90 Elbow both ends Seal Caulk Around Pipes at B...

Страница 47: ...o length to resemble illustration NOTES Header box drain tubing is routed thru the blower deck and side of cabinet Header box drain tubing is routed thru the blower deck and side of cabinet Drain Line...

Страница 48: ...TION AIR FLUE PIPE AIR FLOW 1 2 3 4 5 6 7 8 Rubber Grommet COMBUSTION AIR See VIEW C for drain line positions See VIEW C for drain line positions See VIEW D for drain line positions Plug Plug See VIEW...

Страница 49: ...W E for drain line positions PVC TEE Reducer 1 2 x 1 2 Hose Barb 1 All drain lines must be trapped with J Trap or field supplied loop 2 Drain line traps may be positioned inside or outside the cabinet...

Страница 50: ...Switches Inducer Motor Control Box Inducer Limit Switch Main Air Limit Switch AIR AIR FLOW FLOW 1 2 3 4 5 6 7 8 Burner Assembly Flame Sensor Roll Out Switch Finish Flange Blower Assembly behind blowe...

Страница 51: ...51...

Страница 52: ...NAME CITY STATE INSTALLATION ADDRESS CITY STATE UNIT MODEL UNIT SERIAL Minimum clearances per Table 1 page 6 YES NO Has the owner s information been reviewed with the home owner YES NO Has the literat...

Отзывы: