background image

20

13. Use two silver clamps and secure the hoses to drain 

trap. The trap outlet faces the front of the furnace. 

Secure the trap to the cabinet using two screws 

removed in step 2 by inserting the two screws through 

the large set of holes in the top mounting tabs of the 

trap into the two pre-drilled holes in the side of the 

cabinet.

14. 

Refer to Field Supplied Drain section for instructions 

on field supplied/installed drain on outlet of furnace 

trap.

Insert flange.  Cut 2 ½” long

.

RF000142

2 ½”

Figure 28

Horizontal Installation with Left Side Down - 

Alternate

*See Front Cover Pressure Switch Tube Location on Figure 

27.

1. 

Draining the RF000142 Coupling: Locate hose #2 

(factory installed). Cut off and discard the 45° radius 

end.

2.  Install 90°radius end of hose #2 on RF000142 drain 

outlet and secure with a red clamp.

3.  Insert coupling in hose #2 and secure with a red 

clamp.

4.  Locate hose #5 and cut 3” from the non-grommet end. 

Discard the section without the grommet.

5.  Insert the cut end of tube #5 through the lower cabinet 

drain hole.

6.  Insert 100° elbow in the cut end of hose #5.

7.  Locate hose #6. Using red clamps, connect between 

the coupling and 100° elbow, cutting off excess 

tubing.

8. 

Draining the Collector Box: Remove cap from left 

side collector box drain port (bottom in horizontal left 

position) and install it on right side (top) collector box 

drain port and secure with a red clamp. 

9.  Install the non-grommet end of hose #11 from outside 

the cabinet in the upper drain hole. Install on collector 

box and secure with a silver clamp.

10. Use two silver clamps and secure the hoses to drain 

trap. The trap outlet faces the front of the furnace. 

Secure the trap to the cabinet using two screws 

removed in step 2 by inserting the two screws through 

the large set of holes in the top mounting tabs of the 

trap.

ELECTRICAL CONNECTIONS

WARNING

Edges of sheet metal holes may be sharp. Use gloves as a 

precaution when removing hole plugs.

Wiring Harness

The wiring harness is an integral part of this furnace.   

Wires are color coded for identification purposes. Refer to 

the wiring diagram for wire routings. If any of the original 

wire as supplied with the furnace must be replaced, it must 

be replaced with wiring material having a temperature 

rating of at least 105°C. Any replacement wiring must be a 

copper conductor. 

115 Volt Line Connections

Before proceeding with electrical connections, ensure 

that the supply voltage, frequency, and phase correspond 

to that specified on the unit rating plate. Power supply to 

the furnace must be NEC Class 1, and must comply with 

all applicable codes. The furnace must be electrically 

grounded in accordance with local codes or, in their 

absence, with the latest edition of The National Electric 

Code, ANSI NFPA 70.

Use a separate fused branch electrical circuit containing 

properly sized wire, and fuse or circuit breaker. The fuse 

or circuit breaker must be sized in accordance with the 

maximum overcurrent protection specified on the unit 

rating plate. An electrical disconnect must be provided at 

the furnace location.

Connect hot, neutral, and ground wires as shown in the 

wiring diagram located on the unit’s blower door. Metal 

conduit is not considered a substitute for an actual ground 

wire to the unit. For direct vent applications, the cabinet 

opening to the junction box must be sealed air tight using 

either an UL approved bushing such as Heyco Liquid 

Tight or by applying non-reactive UL approved sealant to 

bushing.

Line polarity must be observed when making field 

connections. Line voltage connections can be made 

through either the right or left side panel. The furnace is 

shipped configured for a left side electrical connection with 

the junction box located inside the burner compartment. To 

make electrical connections through the opposite side of 

the furnace, the junction box must be relocated to the other 

side of the burner compartment prior to making electrical 

connections. To relocate the junction box, follow the steps 

shown in the Junction Box Relocation section.

Содержание Amana MVS96 Series

Страница 1: ...se a matter of thinking before acting Most dealers have a list of specific good safety practices follow them The precautions listed in this Installation Manual are intended as supplemental to existing...

Страница 2: ...s the applicable Industry Canada technical specifications The manufacturer of the intentional radiator model no BGM111 is Silicon Laboratories Finland Oy which can be contacted by calling 617 951 0200...

Страница 3: ...rged to the outdoors Connect this furnace to an approved vent system only as specified in VENT FLUE PIPE COMBUSTION AIR PIPE section of this manual Never test for gas leaks with an open flame Use a co...

Страница 4: ...properly winterized and the water source closed In the event that the building may be exposed to freezing tempera tures and will be vacant any hydronic coil units should be drained as well and in such...

Страница 5: ...ntrol module or connecting wiring following the discharge process in step 2 Use caution not to recharge your body with static electricity i e do not move or shuffle your feet do not touch ungrounded o...

Страница 6: ...rds Institute 25 West 43rd Street 4th Floor New York NY 10036 National Fire Protection Association 1 Batterymarch Park Quincy MA 02169 7471 CSA International 8501 East Pleasant Valley Road Independenc...

Страница 7: ...garage position the furnace so that the burners and ignition source are located not less than 18 above the floor Protect the furnace from physical damage by vehicles If the furnace is installed horizo...

Страница 8: ...rmostat Location The thermostat should be placed approximately five feet from the floor on a vibration free inside wall in an area having good air circulation Do not install the thermostat where it ma...

Страница 9: ...awl space it must be suspended from the floor joist or supported by a concrete pad Never install the furnace on the ground or allow it to be exposed to water Figure 3 Front Cover Pressure Switch Tube...

Страница 10: ...t 5000 ft Manifold Pressure at 7500 ft CO2 Natural Gas Max Allowable Venting 3 in only MVS960603BU 100 ft MVS960805CU 80 ft 2 5 w c 2 4 w c 6 5 8 5 Table 2 Vent Pipe Combustion Air Pipe This manual wi...

Страница 11: ...vent connector and must not be vented into masonry chimney A masonry chimney may be used as a chase or passage way for approved venting materials providing the masonry chimney is not also being used t...

Страница 12: ...60805CU MODEL Pipe Size in Number of Elbows MVS960603BU 0 4 999 FT ALTITUDE 5 000 7 500 FT ALTITUDE MVS960805CU 3 3 100 MODEL Pipe Size in Number of Elbows MVS960603BU 69 93 87 81 75 63 57 80 43 37 73...

Страница 13: ...aft blower outlet When using the horizontal alternate vent configuration you must use the RF000142 vent drain kit See Figures 10 11 follow steps below NOTE In the horizontal left installation position...

Страница 14: ...The vent termination of a direct vent application must terminate at least 12 from any opening through which flue gases may enter a building door window or gravity air inlet The vent termination of ven...

Страница 15: ...HEIGHT DIFFERENCE 12 MIN TO ROOF OR HIGHEST ANTICIPATED SNOW LEVEL Vertical Termination Figure 14 STRAIGHT ELBOWS Figure 15 VENT FLUE TEE or 45 ELBOW TURNED DOWN or 90 ELBOW TURNED DOWN OPTIONAL 12 M...

Страница 16: ...es If more than one direct vent furnace is to be installed vertically through a common roof top maintain the same minimum clearances between the exhaust vent and air intake terminations of adjacent un...

Страница 17: ...ward slope toward the drain Do not trap the drain line in any other location than at the drain trap supplied with the furnace If the drain line is routed through an area which may see temperatures nea...

Страница 18: ...adapter 45 barb pipe adapter Installer selects right or left side drain and installs this hose accordingly Figure 25 Drain Exiting Right Side 1 Locate and Install the 45 pipe hose drain coupling from...

Страница 19: ...Location Figure 27 Horizontal Installation with Left Side Down Minimum 5 clearance is required for the drain trap beneath the furnace See Front Cover Pressure Switch Tube Location on Figure 27 1 Remo...

Страница 20: ...oving hole plugs Wiring Harness The wiring harness is an integral part of this furnace Wires are color coded for identification purposes Refer to the wiring diagram for wire routings If any of the ori...

Страница 21: ...ulator blower operation filter removal or routine maintenance To ensure proper unit grounding the ground wire should run from the furnace ground screw located inside the furnace junction box all the w...

Страница 22: ...2 C R C G Y 1 2 C Communicating Two Stage Air Conditioner or Heat Pump Figure 32 1 2 C R C G Y Optional Optional Optional INDOOR BOARD TERMINAL CONNECTIONS OUTDOOR BOARD TERMINAL CONNECTIONS 1 2 C R C...

Страница 23: ...nd is not an indication that the control board needs replacement EXTREMELY IMPORTANT For two stage gas heating the system only needs a single W input Internal algorithms will control the staging of th...

Страница 24: ...2 5 1000 3 8 1520 5 1 2040 1 3 520 2 6 1040 3 9 1560 5 2 2080 1 4 560 2 7 1080 4 1600 5 3 2120 1 5 600 2 8 1120 4 1 1640 5 4 2160 1 6 640 2 9 1160 4 2 1680 5 5 2200 1 7 680 3 1200 4 3 1720 5 6 2240 1...

Страница 25: ...ations The connection is designated as CONDENSATE IN OUT on the control board By default the connected AUX switch is normally closed and opens when the water level in the evaporator coil base pan reac...

Страница 26: ...changing any electrical wiring The accessory load specifications are as follows EAC 1 0 AMP maximum at 120 VAC Table 6 The furnace integrated control module is equipped with a line voltage accessory...

Страница 27: ...ns in the Safety Considerations on page 3 of this manual If you do not smell gas after five minutes move the furnace gas valve manual control to the ON position 8 Replace the burner compartment door 9...

Страница 28: ...and chips If old pipe is used be sure it is clean and free of rust scale burrs chips and old pipe joint compound Use pipe joint compound on male threads ONLY Always use pipe joint compound pipe dope t...

Страница 29: ...abinet Alternate Gas Line Location Plug in Alternate Gas Line Hole Ground Joint Pipe Union Gas Valve Ground Joint Pipe Union Manual Shut Off Valve upstream from ground joint pipe union Grommet in Stan...

Страница 30: ...static rating Total external static refers to everything external to the furnace cabinet Cooling coils filters ducts grilles registers must all be considered when reading your total external static pr...

Страница 31: ...and air leakage When the furnace is heating the temperature of the return air entering the furnace must be between 55 F and 100 F Filters Read This Section Before Installing The Return Air Duct work...

Страница 32: ...rated manometer or appropriate gas pressure gauge at either the gas valve inlet pressure tap or the gas piping drip leg See White Rodgers 36J22Y 204 gas valve figure below for location of inlet pressu...

Страница 33: ...m 10 Remove the manometer hose from the hose barb fitting or outlet pressure tap 11 Replace outlet pressure tap White Rodgers 36J22 valve Turn outlet pressure test screw in to seal pressure port clock...

Страница 34: ...eters must not be influenced by radiant heat by being able to see the heat exchanger 3 Subtract the return air temperature from the supply air temperature to determine the air temperature rise Allow a...

Страница 35: ...avoid personal injury or death due to electri cal shock disconnect electrical power BEFORE performing any service or maintenance Annual Inspection The furnace should be inspected by a qualified instal...

Страница 36: ...fied servicer using emery cloth or steel wool Following cleaning the flame sense signal should be above 3 micro amps Flue Passages Qualified Servicer Only The heat exchanger flue passageways should be...

Страница 37: ...s able to consecutively satisfy the thermostat under the set target time for this number of cycles the system will transition to the heat pump for primary heating SdP Menu is enabled if the CFS menu i...

Страница 38: ...ommunicating units AC Compressor Cooling Single Stage single stage non comm units AC1 Compressor Cooling Low Stage communicating units AC2 Compressor Cooling High Stage communicating units dHU Dehumid...

Страница 39: ...ensor Furnace fails to operate E1 Analog Pressure Error Blocked Vent Error Need to check the APS Sensor or its connection if this error is occurred The failure conditions occur as per the following fo...

Страница 40: ...erate Pressure switch circuit is closed at start of heating cycle Pressure switch contacts sticking Short in pressure switch circuit wiring Replace pressure switch Repair short in wiring Induced draft...

Страница 41: ...rom control replace if necessary Furnace fails to operate Polarity of 115 volt AC is reversed Poor unit ground Correct polarity check and correct wiring if necessary Verify proper ground correct if ne...

Страница 42: ...URNACE MUST BE REPLACED PK PLUG CONNECTION 2 4 BK DOOR OPEN OPEN WHEN DOOR SWITCH COMPARTMENT BLOWER SWITCH TEMPERATURE GND C BLOWER CIRCULATOR JUNCTION 40 VA 60 HZ DISCONNECT GAS VALVE 2 MANUFACTURER...

Страница 43: ...erence between Supply and Return Temperatures DB F GAS PRESSURES Gas Inlet Pressure IN W C Gas Manifold Pressure Low Fire IN W C Gas Manifold Pressure High Fire IN W C Gas Type NG Natural Gas LP Liqui...

Страница 44: ...purchased to be directed to the feedback page GOODMAN BRAND AMANA BRAND GOODMAN BRAND AMANA BRAND PRODUCT REGISTRATION Thank you for your recent purchase Though not required to get the protection of...